Project Occupancy when we are only complying with Indoor Water Use Reduction prerequisite under prescriptive path?
CI-v4 WEp1:Indoor water use reductionposted by Edgar Arevalo on
So we have an interior fit out project where we can only comply with the Indoor Water Use Reduction prerequisite and not the credit. Since we are only complying with the prerequisite via
Double-counting non-roof measures
NC-v4 SSc5:Heat island reductionposted by Jacopo Cattaruzzi on
Hi,
What does the "three times the head height" measure mean?
CS-v4 EQc5:Quality viewsposted by Marine Petrosyan on
There is a requirement for projects with unobstructed views, for regularly occupied floor area within three times the head height.
Gender neutral restrooms
NC-v4 WEc2:Indoor water use reductionposted by Karla Mugica on
A project is being worked on that includes gender-neutral bathrooms, which have toilets with the same flow rate (this applies to all bathrooms in the building).
Historical designation and infill site calculation
NC-v4 LTc3:High priority siteposted by Jacopo Cattaruzzi on
Hi,
How to calculate EFLH in a Minimum calcurator
Retail-CI-v4 EAp2:Minimum energy performanceposted by on
Dear all,
We’re currently simulating for only one store area in a department building pursuing LEED v4 Certification.
LTc4 and buildable land
NC-v4 LTc4:Surrounding density and diverse usesposted by Jacopo Cattaruzzi on
Hi,
I am following a project of a hotel complex located in the Italian alps.
14 days VOC Emissions Rate
CI-v4 EQc2:Low emitting materialsposted by Alokmay Behera on
One of the internal paints in the project is Greenguard Gold Certified. The TVOC content is 0.22 mg/m3. For VOC content, the threshold limit is fulfilled.
Baseline parking for a DATACENTER
NC-v4 LTc7:Reduced parking footprintposted by Marion THIBAULT on
Hi everyone,
LEED ID+C Information not available about mechanical system
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi,