Timing of Installation and Commissioning
NC-v4 EAc5:Renewable energy productionposted by Michaella Wittmann on
The LEED Credit template for this credit indicates that the renewable installation has to be complete and commissioned prior to building occupancy.
Flush for Residential Multifamily several stories
NC-v4 EQc4:Indoor air quality assessmentposted by Sue Bryant on
The reference guide states that "If multiple, discrete HVAC systems operate independently, the team may flush out portions of the building as work is completed in each area served by a given system
Timing of water testing
NC-v4 WEc3:Cooling tower water useposted by matt kaye on
Do you test the potable water anytime? or should the testing of the water be done after cooling tower start up process?
No refrigerants used in project
NC-v4 EAp4:Fundamental refrigerant managementposted by Michael Cerom on
Hi, maybe this question could also apply to the Enhanced Refrigerant Management Credit,
Permanent walk-off mat
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Summer Gorder on
Can a 10'-0" permanent walk-off mat comply for the entryway requirements, and if so what would be the required weekly maintenance?
Is a Non-Slip Flooring Treatment Applicable for credit calculations?
EBOM-v4 MRc3:Purchasing - facility maintenance and renovationposted by Andy Stein on
I am looking to see if a non-slip flooring treatment would be eligible to be included in the LEED Calculations and requirements for this credit.
Definition of Homes
ND-Plan-v4 GIBp2:Minimum building energy performanceposted by Edmar Cabra on
We are developing a contraction village that will house contractors for the adjacent new development. The construction village will have accommodation units and support facilities (e.g.
Bicycle Storage for transitional housing for homeless
NC-v4 LTc6:Bicycle facilitiesposted by Summer Gorder on
I am working on a Behavioral Health Resource Center for Multnomah County, and I am not sure how to classify the occupants for the calculations.
Monitoring : Natural Ventilation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Premal Solanki on
We are working on a residential project (5-Story) that is being certified v4 BD+C. The dwelling units are naturally ventilated.
Exemplary Performance
CS-v4 EAc2:Optimize energy performanceposted by Maria Porter on
Is the Exemplary Performance threshold 54 % for CS as well (like NC?) The leap seems bigger for CS project than for NC Projects, based on that the table ends on 47 % for CS and 50 % for NC, both ac