Forum quick links
ASHRAE Office Occupancy Schedule & Fan Control
CS-v4 EAp2:Minimum energy performanceposted by Cathal Heneghan on
Hi
Option 2-Strategy A: Spotlights on a light rail
NC-v4 EQc6:Interior lightingposted by Timothy Ian Middleton on
We have an office project pursuing option 2. Our design is mainly downlighting and spotlights on a lighting rail system.
Distribution of preferred parking on mixed-used buildings
NC-v4 LTc8:Green vehiclesposted by Sofia Barahona on
Hi, we are working on a Core and Shell project which has mixed uses: offices and commercial.
VAV Fan-Powered Box Minimum Stop
CS-v4 EAp2:Minimum energy performanceposted by Saif Alsaeed on
Hi,
Estimate on how many Liters of paint used?
NC-v4 EQc2:Low emitting materialsposted by Samantha Lee on
All,
I am having trouble gathering the exact amount of paint used on the project I am working on. What is your best advice for entering the volume of paints used?
Quality views on non-regularly spaces
CI-v4 INc1:Innovationposted by Adriana Hansen on
This credit promotes an usual concept of projects, that include a open office and big breakroom that integrates all of employees in each floor.
Pipe Thread Sealant with General Emissions Evaluation
NC-v4 EQc2:Low emitting materialsposted by Spott Lampoon on
Has anyone found a pipe thread sealant manufacturer that has acquired a GEE for their product?
WaterSense label req for existing Base Building Fixtures?
CI-v4 WEc1:Indoor water use reductionposted by RDK E&S on
Hello,
Option 1: Filtration
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Rodolfo Loro, Jr. on
In Philippines which parameters shall be considered to identify whether an area is non-attainable for PM10 and PM2.5?
Credit Form - 25% vegetated requirement (Form has Error)
NC-v4 SSc3:Open spaceposted by Amarpreet Sethi on
The LEED User Guide clearly states in Equation 2.