Forum quick links
Forum
Topic
Replies
Recent
Modeling baseline with System 2 of proposed hotel building with system 8
CS-v4 EAp2:Minimum energy performanceposted by Natalia Quintanilla on
Hi,
3
Mon Oct 14, 2019, 6:50 pm
Should meters by themselves hold data for 36 months?
NC-v4 EAc3:Advanced energy meteringposted by Edgar Arevalo on
To be clear, even though the reference guide states "The system must be capable of storing all meter data for at least 36 months", does that mean the energy meters should have capability or does th
4
Fri Oct 11, 2019, 2:54 pm
Simple box model
NC-v4 IPc1:Integrative processposted by Edgar Arevalo on
Ok.... So I'm working on my first LEED v4 BD+C project, and we're looking to pursue the IP credit.
13
Fri Oct 11, 2019, 10:08 am
LEED NC V4, minimum OA for tenant spaces.
NC-v4 EQp1:Minimum indoor air quality performanceposted by Santiago Sánchez Sánchez on
Hi all,
3
Thu Oct 10, 2019, 3:14 pm
EAp2-Energy Modeling _ Natural Ventilation/cooling Equivalent in Baseline models?
Mid-Rise-v4 EAp1:Minimum energy performanceposted by Claudio Leon on
Dear all,
1
Wed Feb 7, 2024, 9:05 am
80% - how to determine 80% of flush and flow fixtures
NC-v4 WEc4:Water meteringposted by Sue Bryant on
The requirement is to meter 80% indoor plumbing fixtures and fittings as described in WEp Indoor Water Use reduction: lavs, toilets, urinals, showers.
0