Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

When is a CAPP Plan not a LEED conforming Plan?

NC-v4 SSp1:Construction activity pollution prevention
posted by  Harry Flamm  on 

We are building a high-rise residential building in a tight urban (Boston) site that is under 1-acre in size.

2
Tue Oct 1, 2019, 1:44 pm

LEED v4 Interior Lighting Quality Option 2, Strategy A

NC-v4 EQc6:Interior lighting
posted by  Kera Lagios  on 

Strategy A states: "For all regularly occupied spaces, use light fxtures with a luminance of less than 2,500 cd/m2 between 45 and 90 degrees from nadir." Referring to the luminance tables on cut

14
Mon Sep 30, 2019, 9:10 pm

Dmestic Hot Water heating "capacity"?

NC-v4 WEc4:Water metering
posted by  Karen Joslin  on 

I'm surrounded by really smart mech engineers and we need clarification about how to measure the total combined heating capacity.

2
Mon Sep 30, 2019, 3:36 pm

Operable Partitions

NC-v4 EQc2:Low emitting materials
posted by  Jeff Ross-Bain, PE, LEED Fellow, WELL AP  on 

We have a project that is struggling to find LEEDv4 compliant operable partitions.

0

v4 Compliant Stadium/Athletic Field Lighting

NC-v4 SSc6:Light pollution reduction
posted by  Peter Doo  on 

Does anyone know of a manufacturer for v4 compliant athletic field lighting.

1
Mon Sep 30, 2019, 8:06 pm

Mid-Rise-v4 MRp1 - Certified tropical wood -- if 100% is NOT AVAILABLE , what is solution

Mid-Rise-v4 MRp1:Certified tropical wood
posted by  Howard Block  on 

We are a  65 year old  FSC  Certified large lumber yard near Washington DC.  We have a project  certifying :   LEED v4 Homes and Multifamily Midrise .

0

Option 3 flexible lighting control system required documentation

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Alara Brinton  on 

I'm not entirely sure what the LEED online form/template means in regards to calculations for flexible lighting control system.

3
Thu Sep 26, 2019, 9:21 am

Outdoor Water Feature (decorative water fountain)

NC-v4 WEp1:Outdoor water use reduction
posted by  Sophie Kerr  on 

Are exterior water features included in outdoor water calculations?

 

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Wed Sep 25, 2019, 7:48 pm

Filtered water faucet in Hotel Dwelling Units

NC-v4 WEp2:Indoor water use reduction
posted by     on 

I wrote a couple weeks back, with some questions on the "v4v4 1_Indoor Water Use Reduction Calculator."  I just discovered that the dwelling units will have two faucets, one for hand washing,

4
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Tue Sep 24, 2019, 8:29 pm

Using Schools option 2 - Pedestrian Access for a Community Service Center

NC-v4 LTc4:Surrounding density and diverse uses
posted by  nancy picard  on 

Has anyone ever seen new construction projects where an exception was made for them to use Schools option 2  - Pedestrian Access even if applying for another type pf building?

1
Wed Sep 25, 2019, 2:28 pm