LEED Water Side Calculator for DES1
NC-v4 EAp2:Minimum energy performanceposted by elvin ruya on
Hi,
Maps from the Stone Age Don't Exist?
NC-v4 SSc4:Rainwater managementposted by Hannah Fleck on
I am trying to track down historical information to meet the compliance for the pre-development pathway but am coming up short for finding land cover and contour maps predevelopment.
Energy modeling for Half a Floor
CI-v4 EAp2:Minimum energy performanceposted by Edgar Arevalo on
So we are facing a new Commercial Interior project that only takes up approximately half of a floor. The problem we are facing is if we can conduct an energy model for half of floor. Th
SRI for a GREENHOUSE
CS-v4 SSc5:Heat island reductionposted by Marion THIBAULT on
Hello everyone, I'm working on a project that plans to integrate a greenhouse. I wonder how to consider the roof of the greenhouse for the SRI coefficient?
Determine Number of Tests / Sampling Protocol
NC-v4 EQc4:Indoor air quality assessmentposted by Kelsey Wotila on
Hi All,
Rainwater management
NC-v4 SSc4:Rainwater managementposted by Ahmed Hamed on
how to Calculate runoff volume to be managed on site giving rainfall data?
could fixture fittings be exempt from the scope?
CI-v4 WEp1:Indoor water use reductionposted by Junko Miyamoto on
Hello,
Projects located where standard supply pressure is different than the LEED baseline supply pressure
NC-v4 WEp2:Indoor water use reductionposted by Takayuki Hirota on
In LEED v4.1 WE Prerequisite: Indoor Water Use Reduction requirement, it reads:
Fixtures in European Projects – What do we do about the pressure given the Flows in Europe
CS-v4 WEc2:Indoor water use reductionposted by Konstantina Kalliakoudi on
Hello
Enhanced Commissioning - Envelope Commissioning
NC-v4 EAc1:Enhanced commissioningposted by Todd Bundren on
I am working on a new Cancer Center in St. Louis, MO. We are pursuing the envelope commissioning credits and have a question regarding the requirements: