Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent
1
Thu Jan 16, 2020, 12:20 pm

LVR wood stain and concrete sealer

CI-v4 EQc6:Interior lighting
posted by  Sue Bryant  on 

How do you find the LVR for these products? 

0

Waste Management Coordinator

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Akshay Padwal  on 

The person (program manager) who is coordinating waste management, do they have to be LEED certified? 

2
LEED Services Director
Group14 Engineering, Inc.
LEEDuser Premium Member
47 thumbs up
Wed Aug 7, 2019, 12:05 pm

Requirements for "Ongoing Feedback Mechanism"?

CI-v4 IPc1:Integrative process
posted by  Renee Shirey  on 

The requirement of "Briefly describe the planned method for gathering feedback on occupant satisfaction. Include information on sample sizes,

1
Tue Sep 3, 2019, 7:08 pm

PV panels outside the Leed project boundary

NC-v4 EAc2:Optimize energy performance
posted by  Stephan Zweig  on 

Hello to all Leed User community,

I have following question:

Is it possible for the credit Otpimize enetgy performance to count PV panels that are located outside the LPB?

3
Default Avatar
Civil Engineer
BLPTK Construction
LEEDuser Basic Member
3 thumbs up
Tue Aug 6, 2019, 3:00 pm

LEED for Healthcare

NC-v4 EAp2:Minimum energy performance
posted by  Dave Hubka  on 

Hello Marcus,

Why is there a sliding scale for Healthcare as opposed to New Construction?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Aug 5, 2019, 9:10 pm
1
Tue Sep 3, 2019, 7:00 pm

Water fountains and impact on OUtdor Water Use reduction in LEED v.4

NC-v4 WEc1:Outdoor water use reduction
posted by  Tim Bell  on 

Does anyone have any previous experience on the impact of water fountains and features on Outdoor Water Use reduction?  Should these be included or not?  There does not appear to be any s

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Aug 1, 2019, 4:39 am