Forum quick links
Water fountains and impact on OUtdor Water Use reduction in LEED v.4
NC-v4 WEc1:Outdoor water use reductionposted by Tim Bell on
Does anyone have any previous experience on the impact of water fountains and features on Outdoor Water Use reduction? Should these be included or not? There does not appear to be any s
5 Year contracts delivered annually
NC-v4 EAc7:Green power and carbon offsetsposted by Heather Schrock on
Hi! I am a REC retailer and I strongly encourage LEED to consider changing the requirement that RECs be delivered annually under a 5 year contract.
Daylight Option 2 Grid Size
NC-v4 EQc7:Daylightposted by Ziad Zeytoun on
The LEED Reference Guide does not specify a grid size for daylight illuminance simulations.
batteries chargers - load shift needs to be mentioned in O&M plan, but where?
EBOM-v4 EAp1:Energy efficient best management practicesposted by Jimmy Adames on
Hi everyone,
Appliance and Process Water
Hospitality-NC-v4 WEc2:Indoor water use reductionposted by Ricardo Sá on
Dear All,
Space Control ASHRAE 90.1 2010 9.4.1.2
CI-v4 EAp2:Minimum energy performanceposted by Ciaran McCabe on
ASHRAE 90.1 2010 9.4.1.2 Space Control states:
Proposed building with Air to Air Heat Recovery in AHU - how is the baseline
NC-v4 EAc2:Optimize energy performanceposted by Stephan Zweig on
Hello to all LEED user experts,
In our project the AHU contains a hifh efficiency heat exchanger.
Government mandated fixtures - exempt?
NC-v4 SSc6:Light pollution reductionposted by Jeff Wiedmeyer on
On a project located in New Jersey, US, we have some regional government mandated light poles for street lighting leading into our LPB. If these street lights are mandated by local government
Baseline HVAC System for Floors with Conditioned Spaces with no Ventilation
NC-v4 EAp2:Minimum energy performanceposted by Pan Pan on
Hi!