Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

VOC limits for concrete curing compound

NC-v4 EQc2:Low emitting materials
posted by  Jeff Wiedmeyer  on 

Does anyone know what the max allowable VOC limit is for a dissipation concrete curing compound?  The product data submittal states VOC content is 301 g/L.  I read that the USGBC requirem

1
Mon Sep 23, 2024, 6:18 pm
2
ESG consultant, LEED AP BD+C
Self Employed
LEEDuser Basic Member
36 thumbs up
Mon Sep 23, 2024, 6:25 am

CO2 Sensors for Open Areas

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Jon Silhol  on 

What is the requirement for spacing of CO2 sensors in large open areas that are classified as high density spaces? I remember from previous LEED versions required one sensor every 5,000 SF.&nb

5
Jacobs Buildings & Infrastructure
LEEDuser Premium Member
140 thumbs up
Fri Sep 20, 2024, 4:15 pm

How to model multiple buildings served by a common chiller plant?

NC-v4 EAp2:Minimum energy performance
posted by  Raheel Mujtaba  on 

There are multiple blocks undergoing the LEEDv4 campus certification on a site.

1
Thu Sep 26, 2024, 3:53 pm

REACH Optimization

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Sandra Moran  on 

Project is N America (outside USA). Manufacturer is Europe HQ with global operations; uses European standards for global manufacturing.

7
Advocate
EcoAdvisor Group LLC
LEEDuser Basic Member
0 thumbs up
Thu Sep 19, 2024, 9:33 am
2
Thu Sep 19, 2024, 2:42 am

Reheating more than 30% at the VAV

NC-v4 EAp2:Minimum energy performance
posted by  Dave Hubka  on 

I am becoming involved with a project that is being designed to reheat more than 30% of the max cooling airflow rate at the VAV box. 

2
Senior Energy Wizard
TLC Engineering Solutions
LEEDuser Premium Member
44 thumbs up
Wed Sep 18, 2024, 3:28 pm

5 year replacement period?

CI-v4 EAp3:Fundamental refrigerant management
posted by  Laura Charlier  on 

"For existing buildings with existing equipment or projects that use existing central plants, teams will need to check if CFC-based refrigerants are being used.

0
3
Lead Mechanical Engineer
Hoefer Welker
LEEDuser Basic Member
2 thumbs up
Mon Sep 16, 2024, 7:17 pm