Forum quick links
Emissions dans l'air intérieur
NC-v4 EQc2:Low emitting materialsposted by Francesco Passerini on
Do you know whether the French label "Emissions dans l'air intérieur" class A+ is valid for the credit requirements for interior paints?
Alternative requirements for buildings with high non-regulated loads
NC-v4 EAc5:Renewable energy productionposted by Tim Middleton on
We are working on a Manufacturing Project in Vietnam with very high non-regulated loads (around 75% of the total energy consumption).
Fixtures for Option 2 Lighting Quality, Strategy D.
NC-v4 EQc6:Interior lightingposted by Geoffrey Katz on
A recessed LED troffer type fixture may have an indirect light component by way of internal reflectors that reflect upward-directed light within the fixture back down onto the space below.
2016 T24 energy code - v4_Minimum Energy Performance Calculator_v05 - how much of this needs to be completed
CI-v4 EAp2:Minimum energy performanceposted by Kevin Gilleran on
Hi,
Overventilation for Stack Effect
NC-v4 EAp2:Minimum energy performanceposted by on
I'm working on an energy model for a high-rise project in the Pacific NW that has office and residential, with residential being the top two-thirds of the building.
Core & Shell Data Center (saving from IT load in tenant spaces)
CS-v4 EAp2:Minimum energy performanceposted by Yoyo Shek on
Hi All,
Pilot Credit 82: Local Food Production as Innovation Credit
EBOM-v4 INc1:Innovationposted by Nicole Isk on
We're trying to achieve an Innovation credit for our EBOM Project and considering submitting a Pilot credit 82:Local Food Production/WELL Crédit 51 Food Production as Innovation credit as there's a
Cooling tower counted in WEp2?
NC-v4 WEp2:Indoor water use reductionposted by Hieu Huynh on
Hi LEED experts, my factory has a cooling tower but it's for manufacture process, not for the HVAC system. Will this type of Cooling tower be taken into account for this Prerequisite?
Monitoring-based Cx frequency of analysis and approach clarification
NC-v4 EAc1:Enhanced commissioningposted by Kevin Day on
LEED reference manual states "MBCx can be accomplished via systems submetering, operational points trending, and real-time analyses, such as fault detection and sequence verification."
Drawing Review
NC-v4 EAp1:Fundamental commissioning and verificationposted by Steve Connelly on
Is a drawing review of the building envelope required by EAp1 Fundamental Cx if Enhanced Option 2 is not being pursued?