Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Option 1 Requirements

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Yodi Danusastro  on 

Do we have to meet all the requirement in Option 1 as in mechanically ventilated spaces: A.the Entryway system strategy, B. Interior-cross-contamination prevention, and C.

1
Wed May 15, 2019, 6:13 pm

Other Buildings within LEED Boundary

NC-v4 SSc5:Heat island reduction
posted by  Max Krueger  on 

Should other buildings within the LEED boundary be counted towards this credit? These existing buildings will not be getting certified.

0

Reverberation Calculations for a Library - Option 2

Schools-NC-v4 EQp3:Minimum acoustic performance
posted by  Gwenedd Murray  on 

We have a library that is roughly 40,000cf which requires us to determine maximum reverberation from NRC-CNRC Construction Technology Update No.

1
Fri Oct 30, 2020, 9:21 pm

Option 2: Inputting Direct and Diffuse Horizontal Irradiance in IES

NC-v4 EQc7:Daylight
posted by     on 

I'm working in IES to evaluate the daylight LEED credit option 2 for a project, and one of the requirements is to input direct and diffuse horizontal irradiance.

0

Heat Island Effect Potential

NC-v4 SSc1:Site assessment
posted by  Samantha Varela  on 

Is there an accurate urban heat island map to utilize for this section of the Site Assessment?

 

0

ISO 14001 Certified EMS - Innovation Credit?

NC-v4 INc1:Innovation
posted by  Miguel Rivera  on 

Reposting this question from LEED 2009. Has anyone received guidance on whether this is an acceptable Innovation credit (ISO 14001 Certified EMS) for LEEDv4 projects? 

1
Tue Jun 8, 2021, 6:52 pm
4
Tue May 7, 2019, 6:10 pm

Pharmaceutic Industry Aplication

EBOM-v4 EAc4:Optimize energy performance
posted by  Gustavo Fialho Pinto  on 

According to (Capparella, 2013) the average values ​​of pharmaceutical industry energy spending can be estimated at 4391 kWh / m² per year, and in his article he justifies how the determination of

1
Fri May 17, 2019, 12:12 am

LCA Baseline

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Elizabeth Repin  on 

Hello:

Can we only change envelope assemblies for baseline; do all other items to be the same as the proposed building? 

Thank You! 

 

0
1
Wed May 29, 2019, 1:24 pm