Forum quick links
SSc2 Soil testing for existing soils only?
NC-v4 SSc2:Site development - protect or restore habitatposted by Sue Bryant on
Samples to be tested must be taken from soils that are disturbed and will be revegetated. Restored soil must meet existing soil attributes.
Airflow monitor alarms
NC-v4 EQp1:Minimum indoor air quality performanceposted by Nancy Henderson on
We have several single zone RTU's that will need direct airflow monitors because the units have DCV. The contractor says the low OA alarm will be located on the units at the roof. They
Replacement for the demolished walls
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Simon Sue on
In a CI tenant finish-out, if existing interior partitions are demolished and new interior partitions are constructed in an original configuration (not matching to the demolished partition lay
Fire Station minimum parking?
NC-v4 LTc7:Reduced parking footprintposted by Erin Holdenried on
Looking for suggestions on how to determine the parking ratio for a Fire Station. There doesn't seem to be any use within the Base Ratios Table that align with a Fire Station.
Savings from economizers for boilers for manufacturing proces
NC-v4 EAc2:Optimize energy performanceposted by Thomas Tan on
Dear All,
All year round shaded area
CS-v4 SSc5:Heat island reductionposted by Frantisek Macholda on
Hi, we have a square atrium in the middle of the building.
Chemical Inventory for material other than chemical....
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by PAWAN DAHIWAL on
How does material which don't have any chemical content OR no chemical used during its manufacturing but is a permanent building material, comply with credit? For example Granite OR marbl
Are designated smoking areas required?
EBOM-v4 EQp2:Environmental Tobacco Smoke Controlposted by Anna Kaelin on
My project prohibits smoking onsite and within 50 ft of the building. There are no designated smoking areas on the property.
Data Centre energy model baseline
NC-v4 EAp2:Minimum energy performanceposted by Ameet AA on
Hello,
For a large data centre, I was thinking the baseline should be:
- HVAC: system 8
- CRAC fan power: Ls x 0.0021 + A as per ASHRAE table G3.1.2.9