Mandatory. lighting controls for Proposed case
NC-v4 EAp2:Minimum energy performanceposted by SAMY Chamy on
Clarifications on No Cooling Tower Credit.
NC-v4 WEc3:Cooling tower water useposted by Priya Venkat on
Hi,
Clarifications in automatic lighting controls - Occupancy sensor, Programmable dimming control
NC-v4 EAp2:Minimum energy performanceposted by SAMY Chamy on
Dear Concern:-
we have industrial manufacturing with office building we have applied LEED V4 NC certification
DES Cooling tower
EBOM-v4 WEc3:Cooling tower water useposted by Elyse Dufrene on
Can DES cooling tower serving the project be used to demonstrate water consumption reduction for cooling tower water use credit?
Minimum Indoor air quality compliance procedure - 100% OA AHU with zone level recirculation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Greenlab on
Hello Everyone,
Views for Medical Exam Rooms
NC-v4 EQc8:Quality viewsposted by Kyle Ritchie on
Our project is pursuing LEED v4 BD+C certification and is a University building.
Alternative structure and enclosure limit
CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Susan Heinking on
My team is working on a project that involves a high quantity of structural material and according to the handbook, "Structure and enclosure materials may not constitute more than 30% of the value
Sidewalk as bike trail?
NC-v4 LTc6:Bicycle facilitiesposted by Rob Hink on
Will a concrete sidewalk adjacent to the roadway qualify as a bike path to meet the bike network requirement?
Frequency of Analysis
EBOM-v4 EAc3:Ongoing commissioningposted by Walker Johnson on
This credit states that the frequency of analysis should be at least quarterly in the first year. It doesn't state what specific analysis should be done though. Does anyone have guidance on this?