Forum quick links
Points for being in a LEED certified base building
CI-v4 MPR1:Must be in a permanent location on existing landposted by Dee Spiro on
Hi all - I seem to remember seeing something recently about LEED v4 (or v4.1) ID+C projects again being eligible for points for locating in a LEED certified base building (harkening back to the day
only 2 subsystems required?
CS-v4 WEc4:Water meteringposted by Jens Apel on
I just want to make sure that it is sufficient to meter 2 subsystems; not all that are available in a project.
Restaurant for office emloyees only
NC-v4 LTc6:Bicycle facilitiesposted by Sandra Holmström on
The Project has a restaurant that is for office-employees only - can the transients be counted as 0 if the restaurant only will be used by employees?
average daily visitors
NC-v4 LTc6:Bicycle facilitiesposted by Sandra Holmström on
I would like to know how to calculate average daily visitors. Should it be 11 or 99 average Daily visitors?
Modeling Microturbines in EnergyPro
NC-v4 EAc2:Optimize energy performanceposted by Joel Embury on
I'm working on a 5 story hotel in San Jose, Ca. The project is considering adding Microturbines. Has anyone modeled these in EnergyPro? If so, are they modeled in a similar manner
CBE Tool
NC-v4 EQc5:Thermal comfortposted by Sara Hickman on
Does V4 still allow the CBE tool as a form of documentation for LO?
DOAS & VRF for LEED in EnergyPro
NC-v4 EAc2:Optimize energy performanceposted by Joel Embury on
I’ve been working on a LEED project with VRF & DOAS in San Jose, CA. For the LEED Energy Model, EnergySoft suggested attaching the DOAS to 10 sq. ft.
Outdoor Space
NC-v4 SSc3:Open spaceposted by Daniela Carrillo Lopez on
Would a picnic area with tables and chairs fulfill "a pedestrian-oriented paving or turf area with physical site elements that accommodate outdoor social activities"?
v4 compliant non-shrink non-metallic grout?
NC-v4 EQc2:Low emitting materialsposted by Laura Charlier on
Has anyone come across a v4 compliant non-shrink, non-metallic structural grout that meets ASTM C 1107?
EPD without program operator and/or specific PCR
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Paula Rantanen on
Hi all. Does anyone know whether it is required that an EPD must contain information about the Program Operator and the specific PCR that has been followed when conducting the LCA?