Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Revit Insight software for daylight stimulation

CS-v4 EQc4:Daylight
posted by  Shefali Shah  on 

We are using Revit Insight software for daylight stimulation for (V4.1) option 1

0

Sewage treatment plant used as alternative water source

NC-v4 WEc2:Indoor water use reduction
posted by  Stephan Zweig  on 

Hello to all,

My building uses water for the toilets and for the irrigation from a municipally sewage treatment plan with biological treatment.

1
Mon Feb 18, 2019, 7:16 pm

Rainwater management infrastructure availability

NC-v4 SSc4:Rainwater management
posted by  Emmanuel Pauwels  on 

What happens when a rainwater tank, designed to keep the required amount of rainwater is faced with a second stormevent?

1
Sat Oct 14, 2023, 10:42 pm

Specific design strategies to comply with Construction IAQ Plan

NC-v4 EQc3:Construction indoor air quality management plan
posted by  Amine Zeidane  on 

Hello, 

Whate are the specific design strategies that must appear on HVAC Design Drawings regarding Construction indoor air quality management plan, apart from Filtration media ?

0
6
Default Avatar
MCW Consultants Ltd
LEEDuser Basic Member
0 thumbs up
Tue Feb 12, 2019, 11:51 pm

ATMs allowed?

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Erica Downs  on 

Under v3, ATMs were not allowed as a service (had to be a full-service bank). Is this still true under v4? I don't see anything about ATMs.  Thanks!

3
Default Avatar
Sustainability Consultant
The Green Engineer
LEEDuser Premium Member
7 thumbs up
Tue Feb 12, 2019, 9:50 pm
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Feb 12, 2019, 4:33 pm
1
Tue Feb 12, 2019, 11:59 pm

Double HVAC system per zone

NC-v4 EAp2:Minimum energy performance
posted by  Jorge Lopez de Obeso  on 

Hi everyone, I have this project where the HVAC engineer is designing some interesting HVAC system based on load profiles.

1
Wed Feb 13, 2019, 3:26 pm

Daylight Sensor and/or Occupancy Sensor

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Purva Saxena  on 

Are primary side-lighted areas to be provided with Daylight Sensor, even though these spaces (conference room, meeting rooms, private cabins with area less than 250 sq.

0