LEED Boundary vs. Property Line vs. Limit of Disturbance

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  H Leinbach  on 

I'm not sure where to establish the LEED Boundary for our site, we would prefer it be on the property line because it helps us out with open space credits.  However, the limit of disturbance i

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Feb 7, 2019, 4:14 pm

Do playgrounds count as "athletic fields"?

Schools-NC-v4 SSc2:Site development - protect or restore habitat
posted by  Erica Downs  on 

The reference guide specifically allows the exemption of "dedicated athletic fields that are solely for athletic uses" from the soil restoration criteria.

0

Leed Interpretation 1080 in lieu of MEPC

NC-v4 EAp2:Minimum energy performance
posted by  susan eguia  on 

Hi,

I'd like to ask, is anyone tried to use LI 10480 (Title-24 2016 Equivalency ) in lieu of Minimum Energy Performance Calculator (MEPC) for California project?

1
Wed Feb 6, 2019, 11:51 pm

Box in a Box in another Box

CI-v4 EAp2:Minimum energy performance
posted by  Waleed AlGhamdi  on 

Hi,

We have a LEED v4 ID+C CI project that is a substantial renovation. It's 8 floors and receiving a new HVAC system for the entire building, but there are many peculiar situations:

1
Wed Feb 13, 2019, 3:11 pm
1
Fri Feb 22, 2019, 7:13 pm

Dimmable Controls

NC-v4 EQc6:Interior lighting
posted by  Summer Gorder  on 

Do Dimmable lights suffice for individual workstation lighting control. It seems like theoretically you could provide the three different light level ranges required?

1
Thu Feb 7, 2019, 9:05 pm

Too late for SSp1?

NC-v4 SSp1:Construction activity pollution prevention
posted by  André Harms  on 

A potential LEED project in Addis Ababa, Ethiopia, had already begun demolition and some construction activities before a LEED AP was appointed.

2
Ecolution Consulting
LEEDuser Basic Member
1 thumbs up
Wed Feb 6, 2019, 1:50 pm

"Performance Period" duration

EBOM-v4 WEp2:Building-level water metering
posted by  LEED Pro Consultant  on 

Hi, I want to know the performance period duration for the water efficiency prerequisite "Building-Level Water Metering". Thank you in advance,

3
Wed Feb 6, 2019, 1:37 am

IAQ testing after occupancy?

Schools-NC-v4 EQc4:Indoor air quality assessment
posted by  Gerren Wagner  on 

Has anyone had success in achieving this credit when testing occurred after occupancy?  Our thinking is that the contaminants would test higher after adding people and all the other miscellane

1
Thu Feb 7, 2019, 9:16 pm

Which percentile to use from ITE Tables?

NC-v4 LTc7:Reduced parking footprint
posted by  Erica Downs  on 

The v4 reference guide refers users to the ITE 3rd Ed.

0