Forum quick links
Wastewater used in cooling tower dilution tank.
ND-v4 GIBc14:Wastewater managementposted by Varunya Jarunyaroj on
In the case that, at least 25% and up to 100% of annual wastewater (recycled water) are used in cooling tower dilution tank for dilution purpose before being discharged to public sewer sy
Office building - Water cooled VRF DES
NC-v4 EAp2:Minimum energy performanceposted by Aravindraj RB on
Hello,
IEQ - Interior lighting control (Scene switch)
NC-v4 EQc6:Interior lightingposted by Aravindraj RB on
Hello,
Advanced Energy Metering in Multi-Family Housing
NC-v4 EAc3:Advanced energy meteringposted by Allison Wilson on
We're working on a dorm project with apartment style units such that it's essentially multi-family housing.
air renewal in 72 000cubic meters warehouse
Warehouses-NC-v4 EQp1:Minimum indoor air quality performanceposted by Thibaut REMY on
Hello,
I am looking for help with an issue concerning the ventilation requirement EQP1 for a logistic warehouse.
Refurbishing patio furniture
EBOM-v4 MRc3:Purchasing - facility maintenance and renovationposted by Bo White on
The owner has been considering to replace their patio furniture because it looks weathered. They have been researching qualifying furniture but aren't happy with the look.
BPDO EPDs for typically excluded Masterspec divisions (MEP), without adding to costs for BPDO Sourcing of Raw Material?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Renee Shirey on
Can I gather EPDs for MEP equipment, and NOT be required to include the cost of those products in the calculations for Sourcing of Raw Materials? The Reference Book is clear that "the de
VRP Calculations - compliant or not
NC-v4 EQp1:Minimum indoor air quality performanceposted by susan eguia on
Hi,
We completed the VRP calculations and the summary tab under "Outdoor air intake flow provided meets or exceeds Vot?", it says Yes or No for each system.
Modeled Ventilation Rate with EQpc124
NC-v4 EAp2:Minimum energy performanceposted by Stephen Lyons on
We're evaluating LEED pilot credit EQpc124 which provides an alternative approach to several indoor air quality credits while meeting the minimum IAQ performance prerequisite.
LEED Boundary vs. Property Line vs. Limit of Disturbance
NC-v4 MPR2:Must use reasonable LEED boundariesposted by H Leinbach on
I'm not sure where to establish the LEED Boundary for our site, we would prefer it be on the property line because it helps us out with open space credits. However, the limit of disturbance i