Forum quick links
Materials inside the building
NC-v4 MRc1:Building life-cycle impact reductionposted by Konstantina Kalliakoudi on
Hello,
In my understanding the credits:
Building Life Cycle Impact Reduction
Building Product Disclosure and Optimization - EPD
Design Temperatures in Cooling and Heating - Must they differ 5 oF?
NC-v4 EAc2:Optimize energy performanceposted by Konstantina Kalliakoudi on
Hello to all,
When I am building the proposed building in my energy model has the design temperature in Cooling differ from the design temperature in Heating +5 oF?
ENERGY STAR Equipment and Appliances Policy
CI-v4 EAc2:Optimize energy performanceposted by Saurabh Shrestha on
I am working on a project where the ownership has a policy that requires 100% of equipment and appliances to be ENERGY STAR-rated.
Dwelling Units/Residential definition for ventilation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Larry Jones on
Can anyone provide me with a definition or point me towards how LEED v4 defines a dwelling unit? I have a dormitory project and am trying to interpret the Resi Only requirements for v4.
Previous Renovation Work in a Project
EBOM-v4 MRc5:Solid waste management - facility maintenance and renovationsposted by Craig Sheehy on
Hello,
I wanted to know if we can use the previous renovation work data for this credit. Does the renovation has to take place during the performance period?
P-Patch as Non-Adjacent Open Space for Municipal Owner
NC-v4 SSc3:Open spaceposted by Teresa Stern on
We have a municipal building that won't likely comply with the open space area needed based on the project site area alone. However there is a City-owned P-Patch nearby.
Envelope Commissioning as an Innovation credit in CI-v4
CI-v4 INc1:Innovationposted by Heather DeGrella on
Hi All,
Envelope Commissioning in CI-v4
CI-v4 EAc1:Enhanced commissioningposted by Heather DeGrella on
Hi All,
Additions to Existing Cold Storage Facility
NC-v4 EAp1:Fundamental commissioning and verificationposted by Dustin Norton on
I am working on a project that includes a large existing cold storage facility that will essentially double in size after renovations.
Flush out using building emergency exhaust ventilation system
Retail-CI-v4 EQc4:Indoor air quality assessmentposted by Mahesh Shankar on
The project is a retail store which is not flushing out the space using outdoor air. The exhaust ventilation system of the building is used to