Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

waste generated from new construction

Mid-Rise-v4 MRc3:Construction waste management
posted by  sue bryant  on 

If you are removing an existing building, can the waste from the building be counted if you are recycling it?

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Jan 22, 2019, 8:21 am

Map generation for submittals

Mid-Rise-v4 LTc2:Site selection
posted by  Phil Vanderloo  on 

How is everyone generating maps for credit submittals required for bicycle networks, bus stops, intersections, open spaces, etc. Thanks

3
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Jan 22, 2019, 7:50 am

On-site or off-site separation

Homes-v4 MRc3:Construction waste management
posted by  Amrit Kaur  on 

The credit general requirement requires a percentage of material recycled, and a formal report indicating how much was recycled and to what purpose.

2
Senior Director
Linnean Solutions
LEEDuser Expert
2 thumbs up
Tue Jan 22, 2019, 6:27 am

Logging requirement for 5 years

EBOM-v4 WEc4:Water metering
posted by  Bo White  on 

What are the requirements for the 5 years of logging in terms of data and in terms of logging interval?

1
Thu Feb 14, 2019, 1:20 am
2
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Tue Jan 22, 2019, 1:09 am

Option 2 - Excluding Demo

NC-v4 MRc5:Construction and demolition waste management
posted by  Nathan Gauthier  on 

The credit language says "do not generate more than 2.5 pounds of construction waste..." but the example Equation 2 shows "Total construction AND DEMOLITION waste generated..." Has anybody clarifie

17
Default Avatar
Mission Green Buildings
LEEDuser Basic Member
0 thumbs up
Mon Jan 21, 2019, 10:25 pm

Option 2 - Based on GSF, excluding garage area but including garage CDW?

NC-v4 MRc5:Construction and demolition waste management
posted by  Michelle Bombeck  on 

It appears that the for Option 2, teams must calculate the total waste generated for the project which might include construction of a garage or other site feature that would not be included in the

4
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Jan 21, 2019, 10:25 pm
1
Tue Jan 22, 2019, 3:59 pm

Energy building simulation

NC-v4 EAp2:Minimum energy performance
posted by  Tarek   on 

I took the decision to be a LEED consultant, especially in Energy simulation. so what are the requirements for the LEED certification, qualifications, minimum experience, which program is needed?.

1
Tue Jan 22, 2019, 4:02 pm