Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Additions

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Lorax Partnerships  on 

Our project is an addition built into the crotch of an L-shaped building.

0

BASELINE ROTATION NOT REFLECTING ON HTML

EBOM-v4 EAp2:Minimum energy performance
posted by  Jas Cap  on 

I have a problem in simulating the Baseline Building.

0

Project in a resort attached to casino that allows smoking

NC-v4 EQp2:Environmental tobacco smoke control
posted by  Anna Kaelin  on 

I have a client planning a complete fit-out of one of their retail spaces. The project is located in a resort in Las Vegas, which is attached to a Casino that allows smoking.

4
Default Avatar
Green building manager
Confidential
LEEDuser Basic Member
13 thumbs up
Mon Aug 5, 2024, 12:36 pm
6
Fri Aug 2, 2024, 3:24 pm

"with errata but without addenda"

NC-v4 EAp2:Minimum energy performance
posted by  Alfonzo Collins  on 

The LEED v3 reference book already refers to ASHRAE 90.1 "with errata but without addenda."  The v4 book only says "with errata."  Does that imply that all addenda to ASHRAE 90.1 must be

7
Principal
ME Engineers
LEEDuser Premium Member
29 thumbs up
Thu Aug 1, 2024, 2:41 pm

Single LEED building in Zoo: Demand Response Plan required for entire Zoo?

NC-v4 EAc4:Demand response
posted by  Joyce Kelly  on 

Wondering if the Demand Response Plan needs to address the entire Zoo the way Parking, Green Vehicles credits must.

1
Wed Jul 31, 2024, 9:26 pm

Energy Modelling Software

NC-v4 EAp2:Minimum energy performance
posted by  Eliane Krugman  on 

Hi everyone, 

I'm wondering what is the most common software for energy modelling ASHRAE 90.1

1
Fri Aug 2, 2024, 9:57 pm

Including space in the the project boundary where only one trade is included in scope

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Edgar Arevalo  on 

I have an ID+C project that takes up approximately half of a floor in a building.  When laying out the LEED project boundary, I was confused as to whether to include the restrooms, since it wa

0

Waste-to-Energy Clarification

NC-v4 MRc5:Construction and demolition waste management
posted by  Jenni Huynh  on 

Hi folks,

I had inquired about waste-to-energy as being counted towards waste diversion regarding the Construction + Demolition Waste Mgmt prereq/credit and GBCI said the following:

2
Default Avatar
TAKENAKA Europe GmbH
LEEDuser Basic Member
0 thumbs up
Mon Jul 29, 2024, 5:28 pm

If sub-ing all NC-v4.1 for MR credits, then is NCv4-MRp2 still required if registered as v4?

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Laura Stanley  on 

Has anyone encountered this situation, and been allowed to skip the MRp2 credit since it was omitted in NC-v4.1 in 11/2020?

3
Mon Jul 29, 2024, 12:10 pm