Intumescent Paint and General Emission Evaluation requirements

NC-v4 EQc2:Low emitting materials
posted by  Michael Munn  on 

Do the General Emissions criteria for Paints and Coatings apply to intumescent flame retardants for structural elements? We've had difficulty finding products that meet (or report) compliance.

3
Default Avatar
Project Manager
Entuitive
LEEDuser Basic Member
19 thumbs up
Wed Jan 16, 2019, 12:41 am

Enhanced IAQ - EP for 2 strategies under Option 2?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Teresa Stern  on 

We are looking at installing CO2 monitoring at densely occupied spaces. We are also providing a dust collection system monitor and audible alarm at the firing range in a police station.

1
Tue Jan 15, 2019, 11:13 pm

Does double stacked bicycle racks comply with the credit?

CS-v4 LTc6:Bicycle facilities
posted by  Olga Yuil  on 

Bicycle racks should reflect best practices in design and installation.

3
Head of Sustainability
Manens S.p.A.
LEEDuser Premium Member
16 thumbs up
Tue Jan 15, 2019, 4:16 pm

Question: Example 1. Residential and nonresidential density calculations (BDC Page 84).

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Olga Yuil  on 

Page 84 'FURTHER EXPLANATION' Section Example 1. Residential and nonresidential density calculations from the BDC Reference Guide (Updated August 2018), question:

2
Project Director
Sustainable Design Consulting
LEEDuser Expert
27 thumbs up
Mon Jan 14, 2019, 9:02 pm
3
Dipl.-Ing., Immobilienökonom (ebs)
Masterplan Informationsmanagement GmbH
LEEDuser Basic Member
0 thumbs up
Mon Jan 14, 2019, 7:56 pm

Advanced Energy Metering Whole Building Energy Sources

NC-v4 EAc3:Advanced energy metering
posted by  susan eguia  on 

Hi,

We have Fire Station project and submitted Advanced Meter Cutsheet for Electrical.

3
Default Avatar
LEED Coordinator/Construction Administrator/Business Development
Building Solutions Group, Inc.
LEEDuser Basic Member
47 thumbs up
Mon Jan 14, 2019, 2:52 pm

Existing Building as LCA Baseline

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Kristen DiStefano  on 

One of the four options for creating LCA baselines according to this LEED Interpretation - https://www.usgbc.org/content/100002019 - is to use an existing building, and make modifications necessary