Ozone treatment
NC-v4 EQp1:Minimum indoor air quality performanceposted by Gabriela Crespo on
Dear all, We are working on a project where the ozone levels exceed the most recent three year average, so we must include air-cleaning devices for ozone.
Factory-Existing Building
EBOM-v4 EAp2:Minimum energy performanceposted by VISHESH AGARWAL on
I am working on the factory existing building project. the machine load is about 3000 kw.
Clarify the requirement for offsite coatings (and/or coating that will be covered)
NC-v4 EQc2:Low emitting materialsposted by Summer Gorder on
The team as me to clarify the definition of Primers, Sealers, and Undercoaters in the LEED description? Does that include any coating that gets covered with an addi
Project in Europe
NC-v4 EQc5:Thermal comfortposted by Konstantina Kalliakoudi on
Hello to all,
For Projects that are outside USA, in my case in Europe can I comply with Option 1? Also comply ASHRAE 55-2010?
Or is it necessary to comply with Option 2?
Cross-contamination prevention: dedicated exhaust system still required?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Luis Andrade on
Hi,
Project Boundary - Excluding ceiling work for HVAC and plumbing connections
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Tracy Marquis on
We are renovating spaces on the ground floor of an academic building. The primary renovation spaces are contiguous, however, there will be minor work in the ceilings, outside of the LEED boun
Which building type does data centre belong?
CI-v4 LTc5:Reduced parking footprintposted by Ameet AA on
There's no such a building type as data centre in the base ratio table, I was wondering if it should be "data processing, telemarketing", or "general light industrial, industrial park, and manufact
Changes in the LEED v4.1 BD+C draft to the Option 4 WBLCA - positive, overall
NC-v4 MRc1:Building life-cycle impact reductionposted by Panu Pasanen on
As most will have noted, the language for the v4.1 BD+C draft came out just before holidays.