Construction Work Area Depressurization

NC-v4 EQc3:Construction indoor air quality management plan
posted by  Danilo Ilic  on 

Does anyone have an example of how construction work area depressurization (in order to create a pressure difference between construction and clean areas)&n

4
Senior Sustainability Manager
WSP
LEEDuser Expert
53 thumbs up
Wed Dec 19, 2018, 9:25 am

To use all FSC Mixed Sources label Paper, how many percentage we need fill into the Purchasing calculator field?

EBOM-v4 MRc1:Purchasing - ongoing
posted by  Ray Hsing Chen  on 

Regarding LEED v4 EBOM-MR c1 Purchasing ongoing, When fill out the field of Purchasing calculator- Percent of Product FSC Certified (%) , If all papers are FSC Mixed Sources label, Can we fill 100%

2
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Wed Dec 19, 2018, 3:23 am

Reference Guide Error?

Retail-CI-v4 WEc1:Indoor water use reduction
posted by  Robin Dukelow  on 

The Reference Guide says that WEc is worth 2-12 points for Retail, but Table 1 shows 10-points is the maximum. Has anyone seen a published correction about this?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Dec 17, 2018, 11:40 pm

Employee parking lot with paid parking

NC-v4 LTc7:Reduced parking footprint
posted by  Andrée Iffrig  on 

We're having a debate about how the reduced parking credit applies to a large building serving as a lab. Parking offsite is being constructed with more than 500 spaces dedicated to staff.

1
Tue Dec 18, 2018, 1:32 pm

Informal Transit...

EBOM-v4 LTc1:Alternative transportation
posted by  Shakir Ismail  on 

Hi,

Struggling to find options for alternative transportation for a planned LEED EBOM project in Qatar :S

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Dec 17, 2018, 8:09 pm

Typo in View Factor Chart

NC-v4 EQc8:Quality views
posted by  Chris Edmonds  on 

In the reference guide the table reads the gray-zone range between preliminary view factor 4 and 5 is "40-30". This is a typo and should be corrected to "40-50".

0

Baseline for CI when the CS certification is being carried out simultaneously

CI-v4 EAp2:Minimum energy performance
posted by  Sansiago Velez  on 

This project is a CI fit out for 100% of the leasable floor area of the base building, which is currently being certified as Core and shell.

1
Mon Dec 17, 2018, 3:31 pm