Forum quick links
Existing Building Renovation - What to include in energy model
EBOM-v4 EAp2:Minimum energy performanceposted by Greg DiDomenico on
Hello All,
Lab Ventillation Requirement
EBOM-v4 EAc4:Optimize energy performanceposted by Greg DiDomenico on
Hello All,
Problem with the Quality Assurance Check Section of the MEPC
NC-v4 EAp2:Minimum energy performanceposted by Zeynep Cakir on
Hi everyone,
Construction Work Area Depressurization
NC-v4 EQc3:Construction indoor air quality management planposted by Danilo Ilic on
Does anyone have an example of how construction work area depressurization (in order to create a pressure difference between construction and clean areas)&n
To use all FSC Mixed Sources label Paper, how many percentage we need fill into the Purchasing calculator field?
EBOM-v4 MRc1:Purchasing - ongoingposted by Ray Hsing Chen on
Regarding LEED v4 EBOM-MR c1 Purchasing ongoing, When fill out the field of Purchasing calculator- Percent of Product FSC Certified (%) , If all papers are FSC Mixed Sources label, Can we fill 100%
Reference Guide Error?
Retail-CI-v4 WEc1:Indoor water use reductionposted by Robin Dukelow on
The Reference Guide says that WEc is worth 2-12 points for Retail, but Table 1 shows 10-points is the maximum. Has anyone seen a published correction about this?
Employee parking lot with paid parking
NC-v4 LTc7:Reduced parking footprintposted by Andrée Iffrig on
We're having a debate about how the reduced parking credit applies to a large building serving as a lab. Parking offsite is being constructed with more than 500 spaces dedicated to staff.
Informal Transit...
EBOM-v4 LTc1:Alternative transportationposted by Shakir Ismail on
Hi,
Struggling to find options for alternative transportation for a planned LEED EBOM project in Qatar :S
Typo in View Factor Chart
NC-v4 EQc8:Quality viewsposted by Chris Edmonds on
In the reference guide the table reads the gray-zone range between preliminary view factor 4 and 5 is "40-30". This is a typo and should be corrected to "40-50".
Baseline for CI when the CS certification is being carried out simultaneously
CI-v4 EAp2:Minimum energy performanceposted by Sansiago Velez on
This project is a CI fit out for 100% of the leasable floor area of the base building, which is currently being certified as Core and shell.