Forum quick links
Problem with the Quality Assurance Check Section of the MEPC
NC-v4 EAp2:Minimum energy performanceposted by Zeynep Cakir on
Hi everyone,
Construction Work Area Depressurization
NC-v4 EQc3:Construction indoor air quality management planposted by Danilo Ilic on
Does anyone have an example of how construction work area depressurization (in order to create a pressure difference between construction and clean areas)&n
To use all FSC Mixed Sources label Paper, how many percentage we need fill into the Purchasing calculator field?
EBOM-v4 MRc1:Purchasing - ongoingposted by Ray Hsing Chen on
Regarding LEED v4 EBOM-MR c1 Purchasing ongoing, When fill out the field of Purchasing calculator- Percent of Product FSC Certified (%) , If all papers are FSC Mixed Sources label, Can we fill 100%
Reference Guide Error?
Retail-CI-v4 WEc1:Indoor water use reductionposted by Robin Dukelow on
The Reference Guide says that WEc is worth 2-12 points for Retail, but Table 1 shows 10-points is the maximum. Has anyone seen a published correction about this?
Employee parking lot with paid parking
NC-v4 LTc7:Reduced parking footprintposted by Andrée Iffrig on
We're having a debate about how the reduced parking credit applies to a large building serving as a lab. Parking offsite is being constructed with more than 500 spaces dedicated to staff.
Informal Transit...
EBOM-v4 LTc1:Alternative transportationposted by Shakir Ismail on
Hi,
Struggling to find options for alternative transportation for a planned LEED EBOM project in Qatar :S
Typo in View Factor Chart
NC-v4 EQc8:Quality viewsposted by Chris Edmonds on
In the reference guide the table reads the gray-zone range between preliminary view factor 4 and 5 is "40-30". This is a typo and should be corrected to "40-50".
How to control the maximum number of cycles of the cooling tower?
NC-v4 WEc3:Cooling tower water useposted by Yoyo Shek on
Hi All,
How do we control the maximum number of cycles of the cooling tower?
Baseline for CI when the CS certification is being carried out simultaneously
CI-v4 EAp2:Minimum energy performanceposted by Sansiago Velez on
This project is a CI fit out for 100% of the leasable floor area of the base building, which is currently being certified as Core and shell.