Airport -Terminal- Runways must be included at the calculations?
NC-v4 SSc4:Rainwater managementposted by Konstantina Kalliakoudi on
I have a project that is an Airport Terminal. The Leed boundary includes the runways. Concerning the Credit "Rainwater management": Do the runways participate at the calculations?
Option 2: Parking under cover
NC-v4 SSc5:Heat island reductionposted by Konstantina Kalliakoudi on
Hello to all,
This credit requires the 75% of parking spaces under cover.
1. So this percents refers to parking spaces and not to parking area (m2/ft2), right?
Main Street Program as a Priority Designation
NC-v4 LTc3:High priority siteposted by Teresa Stern on
Our project is located 2 blocks from the nearest historic district, but is within the Downtown area encompassed by the local Main Street Program.
shower location in adjacent building
NC-v4 LTc6:Bicycle facilitiesposted by akshaya bhaskar on
Hello,
Distance to main entrance from long term storage of bikes
NC-v4 LTc6:Bicycle facilitiesposted by akshaya bhaskar on
Hi,
LEED Project Boundary on Contract Documents
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Mark Zoeteman on
Is it required in v4 BD+C to show LPB on civil and architectural contract documents? Project includes renovation and addition to an existing building.
Enhanced Cx Option 2 Envelope Commissioning Requirements
NC-v4 EAc1:Enhanced commissioningposted by Krystina Kattermann on
Hi folks,
LCA Boundary Condition
NC-v4 MRc1:Building life-cycle impact reductionposted by Thanyatorn Khumpairoj on
I have questions about the whole building life cycle assessment (LCA). Why baseline is so open? According to ASHRAE 90.1, Do we use only for U-value of the envelope?
Baseline System 3 for Electricity and Natural Gas
Retail-CI-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
For a retail store less than 1,000 m2 spread in 2 floors with FCUs using electricity for cooling and natural gas for heating could you confirm that Baseline system 3 is applicable for this case?
How we can consider a sits as High Priority site out side US?
Hospitality-NC-v4 LTc3:High priority siteposted by Mohamed Al Kindi on
We are about to consider registering 2 different projects under LEED Gold, however, we are targetting High priority site credit into the score sheet as per the LEED Feasibility.