Alternative Compliance Path to achieve Acoustic Credit
NC-v4 EQc9:Acoustic performanceposted by Wioletta Simlat on
Do you know if there is alternative path to achieve EQ Credit 9 outside the US? I'm working with a Project in Germany and we have a probem with Sound Transmission.
"A discount rate for green vehicles is an acceptable substitute for preferred parking"
NC-v4 LTc8:Green vehiclesposted by Konstantina Kalliakoudi on
Hello to all,
At the Credit " Green Vehicles" is mentioned "A discount rate for green vehicles is an acceptable substitute for preferred parking".
The Definition of the Leed Boundary - How can I be sure that I have made the right decision?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Konstantina Kalliakoudi on
The Definition of the Leed Boundary will affect the whole scorecard, so it is important to take the right decision.
Paver with SRI testing
NC-v4 SSc5:Heat island reductionposted by Lynn Gordon on
Will a stone paver that has been tested and meets the SRI requirement for roofs be acceptacle for hardscape? Or does the paver need to be re-tested for SR?
Thank you,
How to treat a renovation of existing building with areas that a not within the scope of renovation.
CS-v4 EAp2:Minimum energy performanceposted by Eric Dixon on
I am modeling an existing office that is being "re-shelled" and having all of it's windows replaced as well as some HVAC Plant and HVAC zone terminal upgrades in 7 of the 9 floors which are unoccup
Local requirements for rainwater management
CS-v4 SSc4:Rainwater managementposted by Guillaume Rose on
Hi,
Certifying a new airport terminal using LEED - exclude the runways?
NC-v4 SSc2:Site development - protect or restore habitatposted by Ricardo Sá on
Dear All,
One of our clients is considering the possibility of certifying a new airport terminal using LEED and asked us to perform a preliminary evaluation of the potential LEED score.
Table 1 when I have only one transit type: Bus
NC-v4 LTc5:Access to quality transitposted by Konstantina Kalliakoudi on
Hello to all,
I have following questions: In my project I have only one transit type: Bus.
Multizone VAV with FCUs
NC-v4 EQp1:Minimum indoor air quality performanceposted by Gopinath Vasu on
Hi All,
Sub meters replaces building-level electric meters
NC-v4 EAp3:Building-level energy meteringposted by DAVE LI on
We have a stand-alone office building on a corporate campus receives electricity from a campus central utility plant, and the office building is no Building-level energy meters.