Forum quick links
Advanced energy metering total as a Building-level energy metering
NC-v4 EAp3:Building-level energy meteringposted by JAMES CHEN on
Can I use a separate energy metering(Advanced energy metering) total as a Building-l
radius used for density calculations
CI-v4 LTc2:Surrounding density and diverse usesposted by emily reese moody on
Hi all, I had some confusion when I started documenting this credit for two different projects, so I reached out to LEEDCoach for some guidance in how to draw the boundary.
LEED BD+C v4: Specific certification strategies for wineries
NC-v4 LTc4:Surrounding density and diverse usesposted by Ricardo Sá on
Hi,
Cleanroom Chase Area Classification
NC-v4 EAp2:Minimum energy performanceposted by Michael Hill on
I am wondering if anyone knows if a cleanroom return chase would be counted in the conditioned floor area for determining the primary system type for ASHRAE 90.1.
Manufacturer on the list CARB TPC-exempt
NC-v4 EQc2:Low emitting materialsposted by Linh Vu on
Hello, I have a question concerning Composite Wood Evaluation point.
LEED CI v4 in a CS V2009
CI-v4 IPc1:Integrative processposted by Gabriela Mena on
Hi, We are designing a Commercial Interior v4 Space in a building that is already certified under CS v2009 with a Platinum level.
Demonstrate Implementation of CWM Plan (NC-V4)
NC-v4 MRp2:Construction and demolition waste management planningposted by Adrian Arenas on
It is clear to me how the prerequisite is to implement a plan without having to meet any diversion thresholds. However, its not clear how a CWM plan implementation is demonstrated.
Are parking spaces and roads counted as part of the 30% OUTDOOR space?
NC-v4 SSc3:Open spaceposted by Olga Yuil on
Are parking spaces and roads counted as part of the 30% OUTDOOR space?