Forum quick links
Sub-Metering for small service buildings
NC-v4 EAc3:Advanced energy meteringposted by Cyle Sheppard on
I have a question from our Electrical Engineer that I am unsure on.
Composite Wood - CARB Phase II
NC-v4 EQc2:Low-emitting materialsposted by Brad Newkirk on
Does plywood that meets CARB Phase II requirements for formaldehyde emissions automatically meet the requirements of this credit for Composite Wood?
Option 2 (prescriptive path) documentation?
NC-v4 EAp2:Minimum energy performanceposted by Erica Downs on
I have a project attempting EAp2/c2 via the prescriptive pathway, Option 2, 50% AEDG. The only "required documentation" listed in the Reference Guide is the completed AEDG tables, which seems
BIFMA e3 equivalents
CI-v4 EQc2:Low-emitting materialsposted by Samantha Allen on
Does anyone know of any equivalents for BIFMA e3 or level that are available in Europe?
BIFMA e3 Level equivalents in APAC and Europe
CI-v4 EQc2:Low-emitting materialsposted by Tracy Backus on
Are BIFMA e3 level certificates for products recognized as viable certificates outside of NAM? What is the equivalent for APAC and also Europe? I have been referencing the EU Ecolabel i
Domestic Water Booster Pump Energy in LEED
NC-v4 EAp2:Minimum energy performanceposted by Moses Chong on
Has anyone successfully claim energy saving with domestic water booster pump? These pumps are often huge and there're no diversity profiles that I know of.
Can MEP CxA be more than 1 person?
NC-v4 EAc1:Enhanced commissioningposted by Michael on
Hi LEED Experts, I would like to ask: Is it a must to have only 1 key CxA person who will sign all the MEP functional testings?
Rainwater Management - No discharge at all or No immediate discharge?
NC-v4 SSc4:Rainwater managementposted by Junru Shen on
Hi All,
Documentation needed for a renovation project
NC-v4 EAc3:Advanced energy meteringposted by Audrey LEDESERT on
Hi,
I'm working on a renovation project, in Core & Shell. Concerning the different meters, some of them are existing meters.
Option 1 Lighting Control - Undeveloped Future Tenant Spaces
NC-v4 EQc6:Interior lightingposted by James Keohane on
I am working on a project that has the majority of individual occupant spaces that will be completely finished with lighting controls meeting the requirements for Option 1. However, we a