Open space outside LEED project boundary
NC-v4 SSc3:Open spaceposted by Omar Elrawy on
I have a zero lot line project, in which I'm building on 100% of the LEED project boundary. Beside the building I have an open space and parking facility which are owned by building owne
MRc1-Construction Credit - Option 4
NC-v4 MRc1:Building life-cycle impact reductionposted by Konstantina Kalliakoudi on
Hello to all,
LEED C&S (sans C?)
CS-v4 MPR1:Must be in a permanent location on existing landposted by Thomas Gibbons on
Hi folks,
Have a question that I believe relates to Interpretation #10102 and incomplete spaces (though I’m open to suggestions if I’m off-base).
social equity within the supply chain
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Dennis Daniel on
We supply floor covering for LEED v.4 projects. The company I work for has a Code of Conduct that is based on the 10 Principles of the UN Global Compact.
Ergonomics approach for computer users
Retail-CI-v4 INc1:Innovationposted by Anna Scade on
I am attempting the Ergonomics approach for computer users Pilot credit and I am confused about what exactly needs to be provided to confirm that an Ergonomist or Health and Safety Specialist was u
Gross Floor area Question
CI-v4 EQc4:Indoor air quality assessmentposted by Nancy Henderson on
We have a tenant with several full floors being built out in a new core and shell building. Does the gross SF for the purpose of the flush out need to include what would be considered core sp
Membrane Primer VOC – LEED V4 – Healthcare
Healthcare-v4 EQc2:Low emitting materialsposted by Rebecca Barr on
Hi there, we are a fabricator and installer of architectural metal wall panel systems and I was looking for some insight into VOC levels and air and vapour membrane adhesive. We typically use
Select system for the Baseline building according ASHRAE 90.1 -2010 - Proposed wiht Heat pump
NC-v4 EAc2:Optimize energy performanceposted by Konstantina Kalliakoudi on
Hello,
I have following questioning:
My proposed building is nonresidential 710.000 ft2 and the Heating/ Cooling production is made with Chillers and Heat pumps.
Purchased chilled water modelling but pursuing cooling tower use credits
CS-v4 EAc2:Optimize energy performanceposted by Nuttanee Vongveeranonchai on
Dear All,
Chilled Water vs DX System 5 is currently flawed.
NC-v4 EAp2:Minimum energy performanceposted by Alejandro Vera on
At issue, our proposed system (chilled water) is paired against a System 5 (non-residental < 5 floors & 25,000 < SQFT < 150,000) but we are having a problem with the energy modeling wh