Forum quick links
Non-official Bicycle Network
CI-v4 LTc4:Bicycle facilitiesposted by Jonathan Koh on
Hi, my project is located in Ho Chi Minh city and there is no dedicated bicycle network near my building site except for main roads for the traffic.
CS-v4 IPc1 - Integrative Process (Design Charrette)
NC-v4 IPc1:Integrative processposted by Estra Marku on
I was wondering if anyone can shed some light on whether it would be acceptable to conduct a Design Charrette over the course of 4 days, as opposed to a 4 hour charrette in one day?
Thermal Comfort Ranges
NC-v4 IPc1:Integrative processposted by Danilo Ilic on
The part "Assess Thermal Comfort Ranges" is not very clear for me.
Fresh air in Tenant Lease Agreement
CS-v4 EQp1:Minimum indoor air quality performanceposted by Nandana Kumar on
Hi,
Food production in a Business District?
ND-Plan-v4 NPDc13:Local food productionposted by Sareet Benayahu on
Hi. our LEED ND Plan project is for a business and retail sector, with congress halls and hotels. no residential units are planned.
existing trees to remain, but not greenfield
NC-v4 SSc2:Site development - protect or restore habitatposted by emily reese moody on
Our project is building adjacent to an existing building, and will connect to it via a pedestrian bridge. Between the two buildings are several existing, older trees that are required to remain.
Differences between design phase and construction phase
NC-v4 MPR3:Must comply with project size requirementsposted by JORDI CASTELLANO on
hello everyone,
our project has achieved the design phase of LEED review.
Kitchen faucet nominal flow rate vs maximum flow rate
CI-v4 WEp1:Indoor water use reductionposted by shashank gangil on
We are doing a CI project in Hong Kong and going to select a kitchen faucet for installation in the pantry.
Optimize energy on Datacenter equipments
NC-v4 EAc2:Optimize energy performanceposted by Amine Zeidane on
Hello,
thinner use for cleaning purposes
CS-v4 EQc2:Low emitting materialsposted by monica castro urbina on
The construction team want to know if the thinner used to clean the formwork for concrete slabs in the post-tensionnnig method have to comply with the VOC's limit required in the SCAQMD rule 1143?