Non-official Bicycle Network

CI-v4 LTc4:Bicycle facilities
posted by  Jonathan Koh  on 

Hi, my project is located in Ho Chi Minh city and there is no dedicated bicycle network near my building site except for main roads for the traffic.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Oct 17, 2018, 1:03 am

CS-v4 IPc1 - Integrative Process (Design Charrette)

NC-v4 IPc1:Integrative process
posted by  Estra Marku  on 

I was wondering if anyone can shed some light on whether it would be acceptable to conduct a Design Charrette over the course of 4 days, as opposed to a 4 hour charrette in one day?

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Oct 16, 2018, 10:15 pm

Thermal Comfort Ranges

NC-v4 IPc1:Integrative process
posted by  Danilo Ilic  on 

The part "Assess Thermal Comfort Ranges" is not very clear for me.

1
Tue Oct 16, 2018, 5:32 pm

Food production in a Business District?

ND-Plan-v4 NPDc13:Local food production
posted by  Sareet Benayahu  on 

Hi. our LEED ND Plan project is for a business and retail sector, with congress halls and hotels. no residential units are planned.

0

existing trees to remain, but not greenfield

NC-v4 SSc2:Site development - protect or restore habitat
posted by  emily reese moody  on 

Our project is building adjacent to an existing building, and will connect to it via a pedestrian bridge. Between the two buildings are several existing, older trees that are required to remain.

1
Fri May 24, 2019, 3:05 pm

Differences between design phase and construction phase

NC-v4 MPR3:Must comply with project size requirements
posted by  JORDI CASTELLANO  on 

hello everyone,
our project has achieved the design phase of LEED review.

1
Mon Oct 15, 2018, 7:48 pm

Kitchen faucet nominal flow rate vs maximum flow rate

CI-v4 WEp1:Indoor water use reduction
posted by  shashank gangil  on 

We are doing a CI project in Hong Kong and going to select a kitchen faucet for installation in the pantry.

2
Sat Oct 13, 2018, 12:04 am

thinner use for cleaning purposes

CS-v4 EQc2:Low emitting materials
posted by  monica castro urbina  on 

The construction team want to know if the thinner used to clean the formwork for concrete slabs in the post-tensionnnig method have to comply with the VOC's limit required in the SCAQMD rule 1143?

0