Forum quick links
Option 1, Equation 2 - Weighted nonroof or roof calculation
CS-v4 SSc5:Heat island reductionposted by Monte Li on
Hi,
Referring the guide, equation 2 allows the use of SR / SRI weighted ratio to calculate the required area. I do not quite understand the logic of this equation.
How to determine Fan EFLH (Equivalent Full Load Hours)
NC-v4 EAp2:Minimum energy performanceposted by Michael on
Hi LEED experts,
Base Building Supplying Racks
CI-v4 LTc4:Bicycle facilitiesposted by Jane Christen on
We're working on a LEEDv4 Commercial Interiors project in Seattle, WA. Does it matter if the base building is supplying the short term bicycle racks?
Water Fountain / Bottle Filler + Wash Fountain Classifications
NC-v4 WEc2:Indoor water use reductionposted by Cammie Epstein on
1) Does a water fountain / bottle filler not count towards indoor water use? There's no option to list them under flow fixtures in the calculator. What am I missing?
Tools for Canada?
NC-v4 LTc3:High priority siteposted by emily reese moody on
Have y'all found any handy tools similar to the HUD or Opportunity Zone maps that we typically use for US projects...but for Canada?
Enhanced Refrigerant Management - Non-regular Refrigerant
NC-v4 EAc6:Enhanced refrigerant managementposted by Song Zhang on
Hello all,
Environmental Attributes of Renewable energy needs to be retained
NC-v4 EAc2:Optimize energy performanceposted by KHIM BOK TAN on
Hi all
Additions
NC-v4 MRc1:Building life-cycle impact reductionposted by Lorax Partnerships on
Our project is an addition built into the crotch of an L-shaped building.
BASELINE ROTATION NOT REFLECTING ON HTML
EBOM-v4 EAp2:Minimum energy performanceposted by Jas Cap on
I have a problem in simulating the Baseline Building.