Forum quick links
Option 1 Bust
NC-v4 EQc4:Indoor air quality assessmentposted by Michelle Rosenberger on
Is there any recourse if you go for an Option 1 flushout and fail to meet the temp or humidity limit at any point during the duration?
Historic building adapted as Hotel - how is baseline treated?
Hospitality-NC-v4 EAp2:Minimum energy performanceposted by Sherman Aronson on
Adapting an historic building as a hotel use with all new HVAC, power, water and all systems but no thermal improvements to the exterior envelope.
Under what conditions would LEED regulate wet-applied low voc finishes inside underground parking garages?
NC-v4 EQc2:Low emitting materialsposted by Annie Levan on
Under what conditions would LEED regulate wet-applied low voc finishes inside underground parking garages?
Acoustic Consultant
NC-v4 EQc9:Acoustic performanceposted by Cora Kenrick on
I just want to clarify that it is not a requirement to have an acoustic consultant for this credit?
Thanks for the help.
Sam Cx agent for Enhanced & Envelope commissioning
NC-v4 EAc1:Enhanced commissioningposted by Cora Kenrick on
Can the same Cx complete both option 1 and option 2 for the Enhanced Commissioning?
Test Method WPSTM C1454 for sealant
NC-v4 EQc2:Low emitting materialsposted by Marina Dimitriadis on
We have a project that wants to use GE SCS1000 Silicone, but the test method for this product is WPSTM C1454 (V: 20 g/L). Would this product still meet the General Emissions and VOC limits?
Shower Use in Schools
Schools-NC-v4 WEp2:Indoor water use reductionposted by Nathan Gauthier on
The default fixture use for showers in schools is 0 per student. Have others kept this value or changed it when including a gym with shower room?
Wool and Sustainable Agriculture Network Conformance
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Amy Alexander on
A project of ours has decided to use wool carpet, and we'd like to be able to take credit for biobased materials. We’d like to explore the "manufacturer-declared conformance to the SAN Sustai
SSc3 - Open Space and the Negative impact on WEc1 - Outdoor H2o Use Reduction; Please advice!
NC-v4 SSc3:Open spaceposted by Olawale Taiwo on
Background:
Lavatory durations - justified deviation from "default" 30 sec?
NC-v4 WEc2:Indoor water use reductionposted by Joanna Switzer on
Hi all, In LEED 2009/v3 the assumption for metered/sensor cycled duration in public lavatories was 12 seconds, per USGBC issued WEp1 "additional guidance" & the excel calculator notes.