Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Option 1 Bust

NC-v4 EQc4:Indoor air quality assessment
posted by  Michelle Rosenberger  on 

Is there any recourse if you go for an Option 1 flushout and fail to meet the temp or humidity limit at any point during the duration?

0

Historic building adapted as Hotel - how is baseline treated?

Hospitality-NC-v4 EAp2:Minimum energy performance
posted by  Sherman Aronson  on 

Adapting an historic building as a hotel use with all new HVAC, power, water and all systems but no thermal improvements to the exterior envelope.

1
Tue Oct 9, 2018, 2:02 pm

Under what conditions would LEED regulate wet-applied low voc finishes inside underground parking garages?

NC-v4 EQc2:Low emitting materials
posted by  Annie Levan  on 

Under what conditions would LEED regulate wet-applied low voc finishes inside underground parking garages?

2
Sustainability Consultant
Stantec
LEEDuser Premium Member
13 thumbs up
Fri Oct 5, 2018, 6:52 pm

Acoustic Consultant

NC-v4 EQc9:Acoustic performance
posted by  Cora Kenrick  on 

I just want to clarify that it is not a requirement to have an acoustic consultant for this credit?

 

Thanks for the help.

1
Thu Oct 11, 2018, 8:28 pm

Sam Cx agent for Enhanced & Envelope commissioning

NC-v4 EAc1:Enhanced commissioning
posted by  Cora Kenrick  on 

Can the same Cx complete both option 1 and option 2 for the Enhanced Commissioning?

2
Regional Director
Horizon Engineering Associates
LEEDuser Premium Member
40 thumbs up
Fri Oct 5, 2018, 5:55 pm

Test Method WPSTM C1454 for sealant

NC-v4 EQc2:Low emitting materials
posted by  Marina Dimitriadis  on 

We have a project that wants to use GE SCS1000 Silicone, but the test method for this product is WPSTM C1454 (V: 20 g/L). Would this product still meet the General Emissions and VOC limits?

1
Fri Oct 12, 2018, 7:26 pm

Shower Use in Schools

Schools-NC-v4 WEp2:Indoor water use reduction
posted by  Nathan Gauthier  on 

The default fixture use for showers in schools is 0 per student. Have others kept this value or changed it when including a gym with shower room?

2
Director of FM Integration and Sustainability
Shawmut Design and Construction
LEEDuser Basic Member
21 thumbs up
Thu Oct 4, 2018, 5:45 pm

Wool and Sustainable Agriculture Network Conformance

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Amy Alexander  on 

A project of ours has decided to use wool carpet, and we'd like to be able to take credit for biobased materials.  We’d like to explore the "manufacturer-declared conformance to the SAN Sustai

2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Thu Oct 4, 2018, 1:32 pm
2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Thu Oct 4, 2018, 12:04 pm

Lavatory durations - justified deviation from "default" 30 sec?

NC-v4 WEc2:Indoor water use reduction
posted by  Joanna Switzer  on 

Hi all, In LEED 2009/v3 the assumption for metered/sensor cycled duration in public lavatories was 12 seconds, per USGBC issued WEp1 "additional guidance" & the excel calculator notes.

10
Design Engineer
MacDonald-Miller
LEEDuser Basic Member
1 thumbs up
Wed Oct 3, 2018, 11:45 pm