NAUF in Low Emitting Calculator for Comp Wood

NC-v4 EQc2:Low emitting materials
posted by  Michelle Rosenberger  on 

Given all the discussion and confusion about composite wood certification issues, why does the version 3 Low Emitting Materials Calculator include NAUF in the pull down for compliant composite wood

20
Marketing Communications
Roseburg Forest Products
LEEDuser Premium Member
14 thumbs up
Wed Oct 3, 2018, 3:29 pm

Site Assessment

Data-Centers-NC-v4 SSc1:Site assessment
posted by  David Edenburn  on 

V4 NC says that a site assessment is a pre-requisite, but then underneath it says for "schools and healthcare". Does this mean is it not a pre-requisite for other types of buildings?

0

Bike Network Diverse Use Restrictions

Schools-NC-v4 LTc6:Bicycle facilities
posted by  Max Krueger  on 

Hi,

 

Do the same diverse use restrictions found in LT Surrounding Density and Diverse Uses apply to the diverse uses that need to connect to the bicycle network?

0

Can sink use dictate type of sink (kitchen/bathroom ) for determining indoor water use reduction rates?

Retail-CI-v4 WEp1:Indoor water use reduction
posted by  Kevin Gilleran  on 

If a sink located in a bar area is used only for washing hands can it be counted as a bathroom sink, or does the sink location dictate its type? 

1
Sun Nov 11, 2018, 3:28 am

Campus District Cooling Tower

NC-v4 WEc3:Cooling tower water use
posted by  Heather Zeto  on 

Our project is on a University campus, which utilizes a Distrcit Plant.  There is no Cooling Tower directly within our project, but there is one at the District Plant.

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Tue Oct 2, 2018, 6:45 pm

Enchanced Cx - District/Campus System Guidance - Floor Area trigger

NC-v4 EAc1:Enhanced commissioning
posted by     on 

One of the triggers of the upstream equipment Cx requirements for EAc1 is that the "project building's gross floor area is greater than 50,000 square feet." Does this 50,000 GSF trigger refer to th

0

Option 4 - whole building life cycle assessment

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Chloe Naese  on 

Hello, could this credit be pursued for a major renovation of a building, or does it only apply to new construction? Thanks!

3
Senior Sustainability Consultant
Steven Winter Associates
LEEDuser Premium Member
9 thumbs up
Tue Oct 2, 2018, 1:11 pm

Data Center Baseline System Selection

NC-v4 EAc2:Optimize energy performance
posted by  Kristen Magnuson  on 

We are modeling a large data center for LEED V4 using the ASHRAE 2010 appendix G as the baseline. The selection of baseline system is not completely clear to me and I was hoping for some guidance.

7
LEED AP BD+C, PM / Energy Modeler
LEEDuser Basic Member
1 thumbs up
Mon Oct 1, 2018, 6:15 pm