Forum quick links
Campus cooling towers
CS-v4 WEc3:Cooling tower water useposted by Ted Kussow on
The building being designed is to be connected to a campus cooling system with cooling towers. Can we get this credit if the campus cooling towers meet the requirements?
Which part of a toilet need water label?
CI-v4 WEp1:Indoor water use reductionposted by Katarzyna Toczynska on
Hi,
we're just deciding on water fixtures on our project and have some trouble with choosing water closets. Our toilets consist of:
- a separate bowl
Number of Bicycle Racks and Changing/shower facilities
CS-v4 LTc6:Bicycle facilitiesposted by LEED Pro Consultant on
We are currently working on a CS building of 146,617 sqm. The calculations according to the Reference Guide requirements, result in 734 racks and 99 shower/changing facilities.
SSc6
EBOM-v4 SSc6:Site improvement planposted by Yaretzy Charo on
What does it mean by documentation of existing site conditions?
Commerical Kitchen Equipment - App.3 requirements
Retail-CI-v4 EAp2:Minimum energy performanceposted by Linda Davisson on
We have a Market space fit-out that has multiple tenants within the this market space (multiple food vendors and restaurants).
LEED for Homes: Midrise Floor Storey limit
Mid-Rise-v4 MPR3:Must comply with project size requirementsposted by Tim Nabholz on
I have a project that is looking at pursuing a LEED certification. The project is a 23 storey residential facility and was wondering if LEED for Homes: Midrise could be pursued.
air cooled chiller minimum full load efficiency COP according to LEED
NC-v4 EAp2:Minimum energy performanceposted by shamim uddin on
Please I am looking for the air cooled chiller minimum full load efficiency COP according to LEED.
Electric Showers
NC-v4 WEp2:Indoor water use reductionposted by Cathal Heneghan on
Hi all
How do we evaluate electric showers since their flow rate will vary on water temperature?
European Climate Zone and Economizers
NC-v4 EAc2:Optimize energy performanceposted by Konstantina Kalliakoudi on
Hello to all,