NC-v4 EQc2:Low emitting materialsposted by Ana García on
Hi all! I have a question regarding LEED requirementes for exterior applied products for schools and healthcare projects: Does a roof PVC membrane have to comply with these requirements or those re
Does IT and AV equipment need to be installed prior to IAQ testing?
CI-v4 EQc4:Indoor air quality assessmentposted by Diana Smiciklas on
Does IT and AV equipment need to be installed prior to IAQ testing? We are moving offices and our IT team will be dismantling and reinstalling AV and IT equipment the weekend prior to our move.
EKOenergy labeled I-RECs
Retail-CI-v4 EAc6:Green power and carbon offsetsposted by Raissa Petri on
Hello,
May I use EKOenergy instead of I-RECs for this credit?
Or EKOenergy labeled I-RECs instead of "REC Brazil" labeled I-RECs?
Thank you!
Greenfield with Underground Utilities
NC-v4 LTc2:Sensitive land protectionposted by Cathal Heneghan on
Hi all
My project is a green field site apart from utility services (water and electric) which run underground through a portion of the site for neighbouring buildings.
Off-Site Waste heat
NC-v4 EAp2:Minimum energy performanceposted by Marcus Sheffer on
There were a couple of previous posts on this subject, one from an industrial process and one from a data center that were located outside the LEED project boundary.
Historic District in vicinity
NC-v4 LTc3:High priority siteposted by Timothy Hillhouse on
I am working on a project in a rural NC town which has a historic district in its downtown area. Our project is downtown however the historic boundary goes around our block essentially surrou
District or not district?
NC-v4 EAp2:Minimum energy performanceposted by Ilaria Piong on
I have a building composed of two parts: a warehouse and an office.
Is carpet included in Low emitting material calculation?
CI-v4 EQc2:Low emitting materialsposted by shashank gangil on
From the LEED v4 CI reference guide, it seems there is no mention of carpet towards low emitting material calculation.
Minimum of 5 material streams to be diverted
CS-v4 MRp2:Construction and demolition waste management planningposted by Chia WL on
Understand that we need at least five materials to be targeted for diversion. For our project, all C&D waste will be commingled and sent to the recycling facility for sorting and recycling.