Should operable windows be included for credit requirement?
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by shashank gangil on
We are currently doing a CI project in Hong Kong which is located in a base building which is LEED platinum rated Version 2.
DES and maximum points achievable
NC-v4 EAc2:Optimize energy performanceposted by Rebecca Aarons-Sydnor on
Under v3, there was a limit to how many points you could earn if you modeled with a DES. We don't see that same limit in the v4 Reference Guide, and are wondering/ hoping whether the limit ha
Data Uploading Issue
NC-v4 EAp2:Minimum energy performanceposted by Muzammal Abbas LEED AP (BD+C) on
Hi,
Do green roofs help to comply this credit? And green walls?
EBOM-v4 SSc1:Site Development- protect or restore habitatposted by Mauricio Ramirez on
Hello. In the v3, green roof area is included to comply with this credit, considering vegetaded surface. I haven't read in the Ref. Guide anything about this credit.
Connectivity within a Big Box Store Shopping Centre
ND-v4 SLLc1:Preferred locationsposted by Tim Nabholz on
What is considered an intersection within a parking lot of a Big Box Store shopping centre.
Alternative Bike Network
Schools-NC-v4 LTc6:Bicycle facilitiesposted by Danielle Waters on
The school zone is located on a road with a 30 mph speed limit sign.
Exterior applied products
NC-v4 EQc2:Low emitting materialsposted by Ana García on
Hi all! I have a question regarding LEED requirementes for exterior applied products for schools and healthcare projects: Does a roof PVC membrane have to comply with these requirements or those re
Does IT and AV equipment need to be installed prior to IAQ testing?
CI-v4 EQc4:Indoor air quality assessmentposted by Diana Smiciklas on
Does IT and AV equipment need to be installed prior to IAQ testing? We are moving offices and our IT team will be dismantling and reinstalling AV and IT equipment the weekend prior to our move.