EKOenergy labeled I-RECs

Retail-CI-v4 EAc6:Green power and carbon offsets
posted by  Raissa Petri  on 

Hello, 

May I use EKOenergy instead of I-RECs for this credit?

Or EKOenergy labeled I-RECs instead of "REC Brazil" labeled I-RECs? 

Thank you!

3
Fri Sep 7, 2018, 4:07 pm

Greenfield with Underground Utilities

NC-v4 LTc2:Sensitive land protection
posted by  Cathal Heneghan  on 

Hi all

My project is a green field site apart from utility services (water and electric) which run underground through a portion of the site for neighbouring buildings.

1
Fri Sep 7, 2018, 11:10 pm

Off-Site Waste heat

NC-v4 EAp2:Minimum energy performance
posted by  Marcus Sheffer  on 

There were a couple of previous posts on this subject, one from an industrial process and one from a data center that were located outside the LEED project boundary.

2
Fri Sep 7, 2018, 3:07 pm

Historic District in vicinity

NC-v4 LTc3:High priority site
posted by  Timothy Hillhouse  on 

I am working on a project in a rural NC town which has a historic district in its downtown area.  Our project is downtown however the historic boundary goes around our block essentially surrou

0

District or not district?

NC-v4 EAp2:Minimum energy performance
posted by  Ilaria Piong  on 

I have a building composed of two parts: a warehouse and an office.

1
Fri Sep 7, 2018, 3:59 pm

Is carpet included in Low emitting material calculation?

CI-v4 EQc2:Low emitting materials
posted by  shashank gangil  on 

From the LEED v4 CI reference guide, it seems there is no mention of carpet towards low emitting material calculation.

1
Mon Dec 10, 2018, 8:20 pm

Minimum of 5 material streams to be diverted

CS-v4 MRp2:Construction and demolition waste management planning
posted by  Chia WL  on 

Understand that we need at least five materials to be targeted for diversion. For our project, all C&D waste will be commingled and sent to the recycling facility for sorting and recycling.

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Fri Sep 7, 2018, 1:33 am
1
Tue Jan 22, 2019, 7:58 am

Interior Cross Contamination Prevention - Building without spaces where hazardous gases or chemicals may be present

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Ricardo Sá  on 

A large office building (> 10.000 m2) that does not include spaces where hazardous gases or chemicals may be present can still achive 1 point associated with Option 1 (Enhaced IAQ strategies), p

0

Rainwater treated in high performance rain gardens and runoff

NC-v4 SSc4:Rainwater management
posted by  Nita Christopher  on 

Project team has selected Option 2 of Rainwater Management Credit. Site is 3.85 acres. Geotech report indicates underlying soils to be clays with little to no infiltration potential.

1