Forum quick links
EKOenergy labeled I-RECs
Retail-CI-v4 EAc6:Green power and carbon offsetsposted by Raissa Petri on
Hello,
May I use EKOenergy instead of I-RECs for this credit?
Or EKOenergy labeled I-RECs instead of "REC Brazil" labeled I-RECs?
Thank you!
Greenfield with Underground Utilities
NC-v4 LTc2:Sensitive land protectionposted by Cathal Heneghan on
Hi all
My project is a green field site apart from utility services (water and electric) which run underground through a portion of the site for neighbouring buildings.
Off-Site Waste heat
NC-v4 EAp2:Minimum energy performanceposted by Marcus Sheffer on
There were a couple of previous posts on this subject, one from an industrial process and one from a data center that were located outside the LEED project boundary.
Historic District in vicinity
NC-v4 LTc3:High priority siteposted by Timothy Hillhouse on
I am working on a project in a rural NC town which has a historic district in its downtown area. Our project is downtown however the historic boundary goes around our block essentially surrou
District or not district?
NC-v4 EAp2:Minimum energy performanceposted by Ilaria Piong on
I have a building composed of two parts: a warehouse and an office.
Is carpet included in Low emitting material calculation?
CI-v4 EQc2:Low emitting materialsposted by shashank gangil on
From the LEED v4 CI reference guide, it seems there is no mention of carpet towards low emitting material calculation.
Minimum of 5 material streams to be diverted
CS-v4 MRp2:Construction and demolition waste management planningposted by Chia WL on
Understand that we need at least five materials to be targeted for diversion. For our project, all C&D waste will be commingled and sent to the recycling facility for sorting and recycling.
90.1-2010/G versus USGBC’s residential midrise simulation guidelines
Mid-Rise-v4 EAp1:Minimum energy performanceposted by James Love on
Parts of these documents seem contradictory.
Interior Cross Contamination Prevention - Building without spaces where hazardous gases or chemicals may be present
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Ricardo Sá on
A large office building (> 10.000 m2) that does not include spaces where hazardous gases or chemicals may be present can still achive 1 point associated with Option 1 (Enhaced IAQ strategies), p
Rainwater treated in high performance rain gardens and runoff
NC-v4 SSc4:Rainwater managementposted by Nita Christopher on
Project team has selected Option 2 of Rainwater Management Credit. Site is 3.85 acres. Geotech report indicates underlying soils to be clays with little to no infiltration potential.