Use of Recharge Pits for credit compliance

EBOM-v4 SSc2:Rainwater management
posted by  Aarti Dhar  on 

Will the Use of Rainwater recharge pits comply with the credit requirement?

0

Addition to an existing LEED Certified Building

CS-v4 MPR2:Must use reasonable LEED boundaries
posted by  maria esther lamadrid  on 

I have an existing LEED Certified Core & Shell v2009 Project where there will be an addition of about 40% more.

0

New V4 Project Boundary Overlaps Existing V2009 Project Boundary

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Doug Shilo  on 

An existing V2009 Project is getting an expansion that will fall under V4.

3
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Fri Jul 27, 2018, 3:17 pm

Minimal Non-roof for LEED Major Renovation Project

NC-v4 SSc5:Heat island reduction
posted by  Edgar Arevalo  on 

The LEED project in question is currently under debate regarding sidewalk upgrade.  Originally, the plan was to upgrade the sidewalk, but then that plan was trashed.  Now it seems the sid

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Fri Jul 27, 2018, 2:07 pm
3
Fri Jul 27, 2018, 12:15 pm

Water analysis

NC-v4 WEc3:Cooling tower water use
posted by  Floyd Valade  on 

The documentation requirements for WEC3 requires the non-potable water analysis if using 100% non-potable (for 2 points).

0
5
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Thu Jul 26, 2018, 8:27 pm

Paints for Artwork

CI-v4 EQc2:Low emitting materials
posted by  Felicity Lee  on 

Hi All,

I have a small office project where we are going to do wall artwork and to be painted by artists on-site. 

0

Blower Door Test for Residential Units

NC-v4 EQp2:Environmental tobacco smoke control
posted by     on 

If a residential project has 4 floors of condos that allow smoking above 5 floors of apartments that do not allow smoking, does there need to be a blower door test performed for every unit, or just

0

Regularly occupied space that has high bay lighting fixtures but needs to comply with Strategy D

NC-v4 EQc6:Interior lighting
posted by  Edgar Arevalo  on 

There is a garage space that acts as an auto service bay (regularly occupied space) but has a high ceiling installed with high bay lighting fixtures.  After weighing all other options, no othe

0