Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Regarding no refrigerant option

NC-v4 EAc6:Enhanced refrigerant management
posted by  Nagaraj Sankar  on 
The project having spaces without cooling systems.In this case can we purchase no refrigerant option to achieve this credit. Anyone please insists to move ahead on this scenario. Thanks in advance
3
Thu Jul 18, 2024, 1:29 am

Hard-lid ceiling with access panel

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Heather Bray  on 

For interior cross-contamination prevention - Has anyone successfully submitted a project with an access panel in a hard lid ceiling?

0
8
Tue Jul 16, 2024, 1:56 am

How to model process chilled water load?

NC-v4 EAp2:Minimum energy performance
posted by  Eric Dixon  on 

My proposed design for lab utilizes a heat recovery chiller connected to geo-exchange. There is a 40 ton process chilled water load on the heat recovery chiller.

1
Thu Jul 18, 2024, 1:46 pm
3
Default Avatar
Energy Consultant - LEED AP BD+C
ECOPENTA
LEEDuser Basic Member
3 thumbs up
Mon Jul 15, 2024, 7:11 pm

Maximum Distance from Parking to Site

NC-v4 LTc7:Reduced parking footprint
posted by  Laraib Raza  on 

Hello All LEED Users,My question is what is the maximum distance allowed from the building(site) to parking? If the Parking is located outside of the site boundary?

0

Lighting Boundary Modification - Light Trespass: Option 1. BUG Rating Method Only?

NC-v4 SSc6:Light pollution reduction
posted by  Lenka Matějíčková  on 

The LEED manual states that, under certain conditions, the lighting boundary can be modified (e.g.when the property line is adjacent to a public street, alley, or transit corridor, the lighting bou

5
Thu Jul 11, 2024, 1:15 am

WaterSense Tool available only for US and Canada?

CS-v4 WEp1:Outdoor water use reduction
posted by  Marine Petrosyan  on 

The LEED Online forms say, that WaterSense Tool supports only zip codes of US and Canada. Does this mean that the tool is not suitable for projects outside the US and Canada?

Thank you.

3
Project Manager
Energy Systems LLC
LEEDuser Basic Member
0 thumbs up
Thu Jul 11, 2024, 1:09 am
2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Thu Jul 11, 2024, 1:06 am
4
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Thu Jul 11, 2024, 1:03 am