Forum quick links
Specs for approved roll out mat that is less than 10'-0" in length
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Victor Caban-Diaz on
Does anybody have specs for an approved roll out mat that is less than 10'-0" in length that can be used for this credit?
Flexible Power Distribution
CI-v4 MRc2:Interiors life-cycle impact reductionposted by roma goyal on
Hello,
I would like to know e=waht does 'flexible power distribution i.e. plug and play system' mean?
what are the equipments to be considered for this system?
Lighting Power Density for berth and roadway areas - space by space method
NC-v4 EAp2:Minimum energy performanceposted by Dionisio Franca on
I'm working with a large scale multi-floor distribution center and trying to determine the correct LPD - lighting power densities of the berths and vehicle paths.
Construction Phases
Hospitality-NC-v4 MPR1:Must be in a permanent location on existing landposted by Larissa Murakami on
We have a project to be registered in LEED NC for hotels. The project consists of several towers and some units of chalets.
Pilot credit - Building Material Human Hazard & Exposure Assessment
Retail-CI-v4 INc1:Innovationposted by Stacey Olson on
It appears that using 5 products which have Declare Labels and/or which are listed on the Pharos site would satisfy the requirements of this credit. Can you please confirm.
Thanks,
CALGreen certification as alternate to Watersense?
CI-v4 WEp1:Indoor water use reductionposted by Paladino "Team" on
Would GBCI accept a plumbing fixture that is CALGreen certified as an alternative compliance path to the Watersense requirement?
Temperatures for Tab.6.8.1I
CS-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
According to Tab.6.8.1I for test procedure for VRF systems we have to consider AHRI 1230. I’m considering AHRI 1230 version “Approved by ANSI on 2 August 2010”.
Accessible Floor and Ceiling system
CI-v4 MRc2:Interiors life-cycle impact reductionposted by roma goyal on
Hello,
I would like to know what does "accesible floor and ceiling system" mean?
Does it mean suspended ceiling system and raised floor system for 50% of the total floor area.
MLO Non-Residential Lighting using the Performance Method
NC-v4 SSc6:Light pollution reductionposted by Candace Cohen on
The MLO says that in order to establish the Total Initial Site Lumens one must use Table D, adding together the Allowed Lumens Per Square Foot and the Allowed Base Lumens Per Site.
STC ratings of standard materials?
NC-v4 EQc9:Acoustic performanceposted by Erin Holdenried on
Hello - Is there a resource available with published STC ratings for standard/generic materials?
Thanks!