Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Specs for approved roll out mat that is less than 10'-0" in length

CS-v4 EQc1:Enhanced indoor air quality strategies
posted by  Victor Caban-Diaz  on 

Does anybody have specs for an approved roll out mat that is less than 10'-0" in length that can be used for this credit?

0

Flexible Power Distribution

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  roma goyal  on 

Hello,

I would like to know e=waht does 'flexible power distribution i.e. plug and play system' mean?

what are the equipments to be considered for this system?

1
Wed Aug 22, 2018, 10:50 pm

Lighting Power Density for berth and roadway areas - space by space method

NC-v4 EAp2:Minimum energy performance
posted by  Dionisio Franca  on 

I'm working with a large scale multi-floor distribution center and trying to determine the correct LPD - lighting power densities of the berths and vehicle paths.

1
Thu Jun 28, 2018, 1:39 pm

Construction Phases

Hospitality-NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Larissa Murakami  on 

We have a project to be registered in LEED NC for hotels. The project consists of several towers and some units of chalets.

1
Fri Jun 29, 2018, 1:24 am

Pilot credit - Building Material Human Hazard & Exposure Assessment

Retail-CI-v4 INc1:Innovation
posted by  Stacey Olson  on 

It appears that using 5 products which have Declare Labels and/or which are listed on the Pharos site would satisfy the requirements of this credit. Can you please confirm.

Thanks,

0

CALGreen certification as alternate to Watersense?

CI-v4 WEp1:Indoor water use reduction
posted by  Paladino "Team"  on 

Would GBCI accept a plumbing fixture that is CALGreen certified as an alternative compliance path to the Watersense requirement?

3
Sustainability Associate
Urban Fabrick, Inc.
LEEDuser Basic Member
7 thumbs up
Tue Jun 26, 2018, 7:17 pm

Temperatures for Tab.6.8.1I

CS-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

According to Tab.6.8.1I for test procedure for VRF systems we have to consider AHRI 1230. I’m considering AHRI 1230 version “Approved by ANSI on 2 August 2010”.

3
Tue Jun 26, 2018, 1:59 pm

Accessible Floor and Ceiling system

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  roma goyal  on 

Hello,

I would like to know what does "accesible floor and ceiling system" mean?

Does it mean suspended ceiling system and raised floor system for 50% of the total floor area.

0

MLO Non-Residential Lighting using the Performance Method

NC-v4 SSc6:Light pollution reduction
posted by  Candace Cohen  on 

The MLO says that in order to establish the Total Initial Site Lumens one must use Table D, adding together the Allowed Lumens Per Square Foot and the Allowed Base Lumens Per Site.

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Tue Jun 26, 2018, 9:23 am

STC ratings of standard materials?

NC-v4 EQc9:Acoustic performance
posted by  Erin Holdenried  on 

Hello - Is there a resource available with published STC ratings for standard/generic materials?

Thanks!

1
Thu Jun 28, 2018, 5:32 pm