Eligible Diversion Materials
Mid-Rise-v4 MRc3:Construction waste managementposted by Kimberly Vermeer on
The waste management contractor for one of my projects is providing reports showing waste going to commingled processing companies.
Water Reduction Calculator for non-residential space
Mid-Rise-v4 WEc1:Total water useposted by Mugdha Mokashi on
The Water Reduction Calculator in the LEED v4_Homes and Multifamily Workbook only addresses the fixtures in units.
Timeline issues with "Recycle or Reuse Construction and Demolition Waste"
ND-Plan-v4 GIBc16:Solid waste managementposted by Ilan Yahav on
How can we proceed with this credit in a LEED ND-plan, if there is a requirement to track diverted waste?
Sharing Commitment for whole-project energy usage data
NC-v4 EAp3:Building-level energy meteringposted by Asad Yousaf on
Dear Fellows;
I need advice. LEED requires letter of Commitment to be signed by the Owner, as its states "Provide a letter from the project owner committing...
Minimum energy performance calculator v4 - Peak demand
NC-v4 EAp2:Minimum energy performanceposted by Fábio Batista on
Hi all,
I have a doubt related with the Minimum Energy Performance Calculator for v4.
Recent toilets, old building
CI-v4 WEc1:Indoor water use reductionposted by Erika Roy on
Hello,
We are working on a CI project that changed the toilets only few years ago with 6lpf. Less than 3 years.
Laminating Adhesives applied off-site
NC-v4 EQc2:Low emitting materialsposted by Catalyst Partners on
For the laminating adhesives, v2009 required all laminating adhesives on and off site to contain no urea-formaldehyde.
Is Energy Recovery Mandatory?
CS-v4 EAp2:Minimum energy performanceposted by Cathal Heneghan on
Hi all
Can you confirm if Energy Recovery per 6.5.6.1 is a mandatory requirement for the proposed building?
Thanks
Baseline case system selection- Exception
NC-v4 EAp2:Minimum energy performanceposted by Manikandan S on
Hi All,
Does economic analysis to forgo DES phaseout apply in V4?
NC-v4 EAp4:Fundamental refrigerant managementposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
In the 2009 Reference Guide, an alternative path that allows foregoing DES plant replacement through an economic analysis that shows DES replacement is economically unfeasible is clearly stated.