Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Core & Shell with HVAC as future / CI scope

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Stacey Olson  on 

If a project is a cold, dark shell without hot water, can commissioning be deferred as n/a or does a cxa still need to be engaged to preform OPR and BOD review?

0

EQc6-lighting

NC-v4 EQc6:Interior lighting
posted by  CR ZHANG  on 

strategy A:

0
1
Thu Jun 21, 2018, 12:03 am

Existing Building HVAC being upgraded and will serve new addition - LPB?

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Sue Bryant  on 

WE have a project that is an addition to an existing building. The addition is served by the HVAC from the existing building.

1
Mon Oct 15, 2018, 7:46 pm

Maintaining 3rd Party

NC-v4 EAc1:Enhanced commissioning
posted by  Brett Farbstein  on 

I have had success acting as the fundamental & enhanced CxA as an employee of the project architect as long as the design team included an outside MEP engineer in v2009.&nbs

1
Wed Jun 20, 2018, 1:37 pm

energy recovery control

CS-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

I’m modelling a System 8 baseline model according to ASHRAE 90.1-2010.

An exhaust energy recovery system is needed according to table 6.5.6.1.

1
Wed Jun 20, 2018, 2:21 pm
1
Wed Jun 20, 2018, 1:32 pm

Number of points awarded for RP

NC-v4 RPc1:Regional priority
posted by  Amrit Kaur  on 

How can I find out how points I would get for a particular RP. Is it always only one point if I pass the threshold?

2
Default Avatar
Association for Energy Affordability
LEEDuser Basic Member
0 thumbs up
Tue Jun 19, 2018, 10:33 pm

Access to the refrigerant impact calculation

NC-v4 EAc6:Enhanced refrigerant management
posted by  Mark Kumar Bose  on 

Hi,

how can I get access to the refrigerant impact calculation (on Leedonline.com) before registering in order to advice the planners if their selected refrigerant complies?

3
Dipl.-Ing., Immobilienökonom (ebs)
Masterplan Informationsmanagement GmbH
LEEDuser Basic Member
0 thumbs up
Tue Jun 19, 2018, 7:56 pm

Energy & water use data sharing committment

NC-v4 EAp3:Building-level energy metering
posted by  Lissa Spitz  on 

Does anyone know - is there actually any other approved third party format besides portfolio manager? Any help would be appreciated. 

1
Tue Jun 19, 2018, 7:42 pm