Sharing Commitment for whole-project energy usage data
NC-v4 EAp3:Building-level energy meteringposted by Asad Yousaf on
Dear Fellows;
I need advice. LEED requires letter of Commitment to be signed by the Owner, as its states "Provide a letter from the project owner committing...
Minimum energy performance calculator v4 - Peak demand
NC-v4 EAp2:Minimum energy performanceposted by Fábio Batista on
Hi all,
I have a doubt related with the Minimum Energy Performance Calculator for v4.
Recent toilets, old building
CI-v4 WEc1:Indoor water use reductionposted by Erika Roy on
Hello,
We are working on a CI project that changed the toilets only few years ago with 6lpf. Less than 3 years.
Laminating Adhesives applied off-site
NC-v4 EQc2:Low emitting materialsposted by Catalyst Partners on
For the laminating adhesives, v2009 required all laminating adhesives on and off site to contain no urea-formaldehyde.
Is Energy Recovery Mandatory?
CS-v4 EAp2:Minimum energy performanceposted by Cathal Heneghan on
Hi all
Can you confirm if Energy Recovery per 6.5.6.1 is a mandatory requirement for the proposed building?
Thanks
Baseline case system selection- Exception
NC-v4 EAp2:Minimum energy performanceposted by Manikandan S on
Hi All,
Does economic analysis to forgo DES phaseout apply in V4?
NC-v4 EAp4:Fundamental refrigerant managementposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
In the 2009 Reference Guide, an alternative path that allows foregoing DES plant replacement through an economic analysis that shows DES replacement is economically unfeasible is clearly stated.
Core & Shell with HVAC as future / CI scope
NC-v4 EAp1:Fundamental commissioning and verificationposted by Stacey Olson on
If a project is a cold, dark shell without hot water, can commissioning be deferred as n/a or does a cxa still need to be engaged to preform OPR and BOD review?