Sharing Commitment for whole-project energy usage data

NC-v4 EAp3:Building-level energy metering
posted by  Asad Yousaf  on 

Dear Fellows;

I need advice. LEED requires letter of Commitment to be signed by the Owner, as its states "Provide a letter from the project owner committing...

7
Fri Jun 22, 2018, 7:41 pm

Minimum energy performance calculator v4 - Peak demand

NC-v4 EAp2:Minimum energy performance
posted by  Fábio Batista  on 

Hi all,

I have a doubt related with the Minimum Energy Performance Calculator for v4. 

3
Default Avatar
LEED Coordinator/Construction Administrator/Business Development
Building Solutions Group, Inc.
LEEDuser Basic Member
47 thumbs up
Fri Jun 22, 2018, 4:34 pm

Recent toilets, old building

CI-v4 WEc1:Indoor water use reduction
posted by  Erika Roy  on 

Hello, 

We are working on a CI project that changed the toilets only few years ago with 6lpf. Less than 3 years.

1
Tue Jun 26, 2018, 7:27 pm

Laminating Adhesives applied off-site

NC-v4 EQc2:Low emitting materials
posted by  Catalyst Partners  on 

For the laminating adhesives, v2009 required all laminating adhesives on and off site to contain no urea-formaldehyde.

0

Is Energy Recovery Mandatory?

CS-v4 EAp2:Minimum energy performance
posted by  Cathal Heneghan  on 

Hi all

Can you confirm if Energy Recovery per 6.5.6.1 is a mandatory requirement for the proposed building?

Thanks

 

1
Fri Jun 22, 2018, 1:41 pm
3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jun 21, 2018, 4:09 pm

Does economic analysis to forgo DES phaseout apply in V4?

NC-v4 EAp4:Fundamental refrigerant management
posted by  Jeff Ross-Bain, PE, LEED Fellow, WELL AP  on 

In the 2009 Reference Guide, an alternative path that allows foregoing DES plant replacement through an economic analysis that shows DES replacement is economically unfeasible is clearly stated.

6
Wed Jun 20, 2018, 10:25 pm

Core & Shell with HVAC as future / CI scope

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Stacey Olson  on 

If a project is a cold, dark shell without hot water, can commissioning be deferred as n/a or does a cxa still need to be engaged to preform OPR and BOD review?