ASHRAE 2010 - Addendum ah - G3.1.3.18 Dehumidification
NC-v4 EAp2:Minimum energy performanceposted by Victoria Watson on
Hi, I am trying to work out how to apply Addendum ah for ASHRAE 2010 for system 5-8
What is the scope or definition for 'other retail' use type under the category 'community serving retail'?
NC-v4 LTc4:Surrounding density and diverse usesposted by Olga Yuil on
What is the scope or definition for 'other retail' use type under the category 'community serving retail' (Appendix 1 Use types and categories, page 795)?
IEQp1 - calculator
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by sebastian castañeda on
My greetings I am working through In the IEQp1 Minimum Indoor air quality performance and I need orientation with respect to systems with natural ventilation. I need to know if exists a calculator
Calculate and document that an open-grid pavement complies with a 50% unbound?
NC-v4 SSc5:Heat island reductionposted by Olga Yuil on
According to the LEED reference guide (definitions on page 206) an open-grid pavement system pavements that consist of loose substrates supported by a grid of a more structura
Solid timber wall shelving / wall panelling made and finished locally
NC-v4 EQc2:Low emitting materialsposted by Aine Doyle on
Dear All,
Non roof measures
NC-v4 SSc5:Heat island reductionposted by Nithya Madan on
Is using mulch considered as a non roof measure under the heat island reduction category?
Carbon Offsets
NC-v4 EAc7:Green power and carbon offsetsposted by Sebastian Braeuer on
Hello. I am new to the entire LEED topic, therefore I have some general questions. Moreover I would like to hear some recommendations. First of all, Carbon offsets must be Green-e certified.
AgBB standard test for projects inside the U.S.
CI-v4 EQc2:Low emitting materialsposted by Nativa Architecture on
Dear All,
Purchased CHW Baseline System Cooling Source
NC-v4 EAp2:Minimum energy performanceposted by Cory Duggin on
My project is an addition to an existing facility, so the CHW and HHW comes from a district plant. I am modeling the plant as cost neutral, purchased CHW and HHW in baseline and proposed