Forum quick links
High-powered experimental equipment
NC-v4 EAp2:Minimum energy performanceposted by DAVE LI on
We have a laboratory with high-powered experimental equipment. High-power experimental equipment consumes a very high percentage of electricity.
BUG Rating System and general equivalent standards for Ireland
CS-v4 SSc6:Light pollution reductionposted by Matt Vesey on
I'm working on an office/industrial mixed use development.
Option 2 HVAC Zoning & Controls
CI-v4 EAc2:Optimize energy performanceposted by Aaron Wintersmith on
The credit language for this Option says "provide a separate control zone for each solar exposure and interior space."
Self-declared reports
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Charalampos Giannikopoulos on
Is there a template of self-declared report for compliance with Option 1? Has anyone ever specified a way of complying with requirements of Option 1? Thank you.
Enhanced Commissioning LEED V4
CI-v4 EAc1:Enhanced commissioningposted by Michael Feyler on
Per the USGBC LEED V4 BD+C: New Construction Enhanced Commissioning website "The CxA may be a qualified employee of the owner, an independent consultant, or a disinterested subcontractor of the des
Hotel mix use
NC-v4 EAp2:Minimum energy performanceposted by jefferson thomas on
We have a hotel with 4,000 SF of retail at the lower level of a new construction hotel project? How do we sepperate the two projects if they have a central energy plan for chilled water?
Future spaces for expansion vs date of certification
NC-v4 EAp1:Fundamental commissioning and verificationposted by Víctor Ramírez Orozco on
we are designing a school project with 14 classrooms and 5 more classrooms planned for future expansión of the school. Those 5 classrooms will not have anything but the walls, windows, and doors.
Exclusions from Regularly Occupied Spaces for Lab Spaces
CS-v4 EQc4:Daylightposted by Jordan Daniels on
I was wondering if someone can help here. Working on a v4 C&S 5 story building. Some of the tenant space on each floor is laboratory space (40% approximately of each floor).
waste rooms
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
The project is located in Europe and standard EN 15251 is considered for the achievement of this prerequisite.
SSp2 Ruling based on Risk Assessment
Healthcare-v4 SSp2:Environmental site assessmentposted by Donal Dignan on
Hi All, I'm working on a Healthcare v4 project that has detected iron in significant concentrations on the project site and it appears to possibly be a background contaminate but this is still bein