Forum quick links
Conference Room vs. Meeting Room / Sliding doors
NC-v4 EQc9:Acoustic performanceposted by Kavita Karmarkar on
Hi everyone,
Airport Terminal - Surrounding terminal and diverse use
NC-v4 LTc4:Surrounding density and diverse usesposted by Konstantina Kalliakoudi on
Hello to everyone,
I am wondering if it is possible for an airport terminal to earn any of the points concerning the Diverse Uses of the credits.
Exterior Noise Monitoring - Rural Roads
Schools-NC-v4 EQp3:Minimum acoustic performanceposted by Leanne Conrad on
In building a rural school, our address is technically a highway (HWY 25 to be exact).
LEEDuser’s viewpoint is little confusing
NC-v4 WEc1:Outdoor water use reductionposted by Mark Kumar Bose on
Hi,
under "LEEDuser’s viewpoint" your only refer to Option 2:
Removed windows
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
In a building that is being refurbished some windows are removed and are replaced with opaque panels. How shall they be considered in the baseline model?
Option 2 (No irrigation meter installed: Calculated water budget)
EBOM-v4 WEc1:Outdoor water use reductionposted by Simon Sue on
Bicyle Storage in a office building
CS-v4 LTc6:Bicycle facilitiesposted by Guillaume Rose on
Hi,
Is the Case 1. commercial or institutional projects applicable for an office building ?
WaterSense labeled fixtures obligatory for Indoor water use reduction
NC-v4 WEc2:Indoor water use reductionposted by Mark Kumar Bose on
In "WEc2: Indoor water use reduction" WaterSense labeled fixtures are obligatory:
Occupancy Calculations in LEEDv4
NC-v4 MPR3:Must comply with project size requirementsposted by Arathi Gowda on
In the new simplified Project Information forms there is no longer a calculator for FTE counts. Are teams using the historic v3 calculators to estimate FTE (along with the baked in assumptions)?