EBOM-v4 SSc1:Site Development- protect or restore habitat
posted by  Branka Zivkovic  on 

Hello,

Reference Guide says in Requirements that that it is Option 1 (On-site restoration) OR Option 2 (Financial support).

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Mon May 14, 2018, 8:32 pm

HVAC Baseline System 8 - with Purchased Chilled Water only

NC-v4 EAp2:Minimum energy performance
posted by  Amgad Khattab  on 

We are working on a project where the selected baseline HVAC system type is 8 with purchased chilled water only from a district cooling plant.

8
Default Avatar
Managing Partner
Engineering Solutions
LEEDuser Basic Member
0 thumbs up
Mon May 14, 2018, 4:30 pm

advanced metering versus meters

CS-v4 EAc3:Advanced energy metering
posted by  Jens Apel  on 

I am somewhat confused comparing the requirements of C&S and New Construction.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon May 14, 2018, 6:12 am

Exemplary Performance for CS-v4 LTc4

CS-v4 LTc4:Surrounding density and diverse uses
posted by  Joanne Sawatzky  on 

The Quick Reference table in the LEEDv4 Reference Guide BD+C says "yes, except WDC" for Exemplary Performance on this credit; however, when I go to the full credit explanation, Exemplary Performanc

1
Wed May 16, 2018, 6:43 pm

1 point for CS-v4 EAc3 - Advanced energy metering?

CS-v4 EAc3:Advanced energy metering
posted by  Joanne Sawatzky  on 

I assume C&S can achieve 1 point with this credit but the Reference Guide doesn't explicitly say 1 point.

"This credit applies to:

1
Sat May 12, 2018, 12:35 am

Contact at USGBC for LEED ND

ND-v4 MPR1:Must be in a permanent location on existing land
posted by  Martine Desbois  on 

I am looking for a contact at USGBC to discuss our project. I cannot seem to be able to reach my previous contacts. Can you suggest someone I can talk to. Thank you, Martine

4
Default Avatar
(old inactive account)
LEEDuser Basic Member
12 thumbs up
Fri May 11, 2018, 7:00 pm
6
Default Avatar
Senior Energy Engineer
Steven Winter Associates, Inc
LEEDuser Basic Member
1 thumbs up
Fri May 11, 2018, 3:26 pm

Contracted Waste and Recycling Service

CI-v4 MRp1:Storage and collection of recyclables
posted by  Summer Minchew  on 

I have a LEED CI project in a building whose contracted waste service does not provide glass recycling due to "depressed markets" and provides single-stream waste and recycling pickup.

2
Director of Sustainability
Lord Aeck Sargent
LEEDuser Expert
10 thumbs up
Fri May 11, 2018, 1:56 pm