Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Shower location

NC-v4 LTc6:Bicycle facilities
posted by  Thu Nguyen  on 

This credit requires that "Provide at least one on-site shower with changing facility for the first 100 regular building occupants and one additional shower for every 150 regular building occupants

1
Mon May 7, 2018, 3:01 pm

Multifamily Setpoints and Equipment Load

NC-v4 EAp2:Minimum energy performance
posted by  Cory Duggin  on 

Are we required to use the equipment loads and setpoints from the Energy Star Multifamily High Rise Simulation Guidelines?  I found that it is referenced by LEED for Homes, but I haven't found

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri May 4, 2018, 2:08 pm

How the fan efficiency W/cfm and pump efficiency W/gpm is decided in Ashrae 90.1?

CS-v4 EAp2:Minimum energy performance
posted by  Homer Wang  on 

Where or which book we can find about how the fan efficiency W/cfm and pump efficiency W/gpm is decided in Ashrae 90.1 just like what type building or how large build is considered and how long duc

3
Fri May 4, 2018, 2:05 pm

default visitor count for retail projects

Retail-NC-v4 LTc6:Bicycle facilities
posted by  Gail Napell  on 

we're doing a C+S with a retail lease space.  How do we determine the retail visitor count for this credit, WE, etc.?  i thought i saw this in v2009 but now i can't find it - can someone

0
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu May 3, 2018, 4:27 pm

Sharing Building-Level Energy Metering Data

NC-v4 EAc3:Advanced energy metering
posted by  Francis Hernández  on 

We have a LEED v4 project for the Corps of Engineers that is connected via the local installations BMS to a remote location for managing the buildings energy systems.  The meters and submeters

1
Thu May 3, 2018, 4:20 pm

Compliant laboratory and medical equipment

NC-v4 WEc2:Indoor water use reduction
posted by  LEED Pro Consultant  on 

For equipment such as steam sterilizer and sterile process washer, the requirement mentions liters/DIN tray, does the tray has to be any specific measure?

0

Lack of Sunday bus service

NC-v4 LTc5:Access to quality transit
posted by  Karen Joslin  on 

I believe the intent of the emphasis on some level of weekend service means both Sat and Sun. If there are 0 trips on Sunday we cannot average with the high number of Sat trips can we?

5
Sustainability Lead
PAE Consulting Engineers
LEEDuser Basic Member
5 thumbs up
Wed May 2, 2018, 5:40 pm

Demolition Waste for entire building vs area designated to be LEED Certified.

CI-v4 MRp2:Construction and demolition waste management planning
posted by  Timothy Hillhouse  on 

We are renovating a 84,000 sqft warehouse and only LEED Certifying a portion of it 9865 sqft.  Should all the construction waste & recycling only be calculated for the small area being cer

1
Thu May 10, 2018, 10:59 pm

EPD as an alternative approach to comply with Option-4 requirements

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Osman   on 

Hi all,

Is it acceptable to quantify for the impact measures in the proposed building using EPD?

Thank you so much for your support,

Osman

1
Thu May 3, 2018, 2:37 am