Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

default visitor count for retail projects

Retail-NC-v4 LTc6:Bicycle facilities
posted by  Gail Napell  on 

we're doing a C+S with a retail lease space.  How do we determine the retail visitor count for this credit, WE, etc.?  i thought i saw this in v2009 but now i can't find it - can someone

0
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu May 3, 2018, 4:27 pm

Sharing Building-Level Energy Metering Data

NC-v4 EAc3:Advanced energy metering
posted by  Francis Hernández  on 

We have a LEED v4 project for the Corps of Engineers that is connected via the local installations BMS to a remote location for managing the buildings energy systems.  The meters and submeters

1
Thu May 3, 2018, 4:20 pm

Compliant laboratory and medical equipment

NC-v4 WEc2:Indoor water use reduction
posted by  LEED Pro Consultant  on 

For equipment such as steam sterilizer and sterile process washer, the requirement mentions liters/DIN tray, does the tray has to be any specific measure?

0

Lack of Sunday bus service

NC-v4 LTc5:Access to quality transit
posted by  Karen Joslin  on 

I believe the intent of the emphasis on some level of weekend service means both Sat and Sun. If there are 0 trips on Sunday we cannot average with the high number of Sat trips can we?

5
Sustainability Lead
PAE Consulting Engineers
LEEDuser Basic Member
5 thumbs up
Wed May 2, 2018, 5:40 pm

Demolition Waste for entire building vs area designated to be LEED Certified.

CI-v4 MRp2:Construction and demolition waste management planning
posted by  Timothy Hillhouse  on 

We are renovating a 84,000 sqft warehouse and only LEED Certifying a portion of it 9865 sqft.  Should all the construction waste & recycling only be calculated for the small area being cer

1
Thu May 10, 2018, 10:59 pm

EPD as an alternative approach to comply with Option-4 requirements

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Osman   on 

Hi all,

Is it acceptable to quantify for the impact measures in the proposed building using EPD?

Thank you so much for your support,

Osman

1
Thu May 3, 2018, 2:37 am

Min. Number of Fixtures

NC-v4 WEc2:Indoor water use reduction
posted by  Cora Kenrick  on 

Hello Fellow Users,

 

Is there a minimum number of fixtures that a project is required to get the 6 points for this credit.

 

3
Energy Engineering Specialist
LEEDuser Basic Member
0 thumbs up
Tue May 1, 2018, 10:15 pm

Credit Review

CS-v4 INc2:LEED Accredited Professional
posted by  Luis Fretes  on 

Can we submit construction credits for review during design?

1
Thu May 17, 2018, 1:15 am

Furniture refurbishment - 30%

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Kriss Kokoefer  on 

How do I find out if any certified companies have received a point for refurbished furniture?  The point is awarded if 30% of the furniture or furnishings are refurbished, reused or salvaged.&

0