Pneumatic Controls - Monitoring Based Cx

CI-v4 EAc1:Enhanced commissioning
posted by  Christopher Lim  on 

I am currently working on a TI project for two floors of a mid-rise building. The current building uses pneumatic controls for the entire building.

0

one product both meet two criteria in option2.

CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materials
posted by  Renaud Gay  on 

Dear All, for option 2 calculation, I have a question on it. My project is a CI retail project. They will use carpet which include recycled content.

8
Sun Apr 22, 2018, 7:09 pm

Multi-occupant spaces required?

Retail-CI-v4 EQc6:Interior lighting
posted by  Jared Silliker  on 

I find the reference guide confusing on this credit. Am I reading it correctly that multi-occupant spaces do NOT need to be addressed for lighting controls within v4 Retail projects?

0

Confirm: Tenant WE calc can include Base Building rainwater system

CI-v4 WEp1:Indoor water use reduction
posted by  Brian Salazar  on 

Hello!  I have a CI project where the tenant occupies multiple contiguous floors.

3
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
LEEDuser Premium Member
43 thumbs up
Fri Apr 20, 2018, 2:13 am

ASHRAE 50% AEDG

CI-v4 EAc2:Optimize energy performance
posted by  AMY VAN DAM  on 

Can a project pursue the prescriptive compliance path if there is not a ASHRAE 50% Advanced Energy Design Guide that is specifically applicable to the base building (i.e.

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Apr 19, 2018, 9:00 pm

Pilot Credit Required or not

CI-v4 INc1:Innovation
posted by  Len Sciarra  on 

With the Innovation in Design credit for LEED-CI v4, the reference guide indicates that you can achieve all 5 credits thru a combination of innovation and exemplary performance credits (option 3).&

4
Default Avatar
Founder and CEO
Greenwave Global Consulting (GGC)
LEEDuser Basic Member
8 thumbs up
Thu Apr 19, 2018, 4:43 pm

Number of meters in C&S

CS-v4 EAc3:Advanced energy metering
posted by  Diego Prada  on 

In the credit language for Core & Shell is stated that a sufficient number of meters should be provided to capture total tenant energy use with a minimum of one meter per energy source per floo

1
Thu Apr 19, 2018, 4:47 pm

Daylight controls in tenant areas

CS-v4 EAp2:Minimum energy performance
posted by  Gopinath Vasu  on 
Hi All, I have a question regarding modeling of daylight controls in tenant office areas in baseline case.
1
Fri Apr 20, 2018, 3:06 pm

Contiguous property

CS-v4 SSc6:Light pollution reduction
posted by  Nadia Bini  on 

The LEEDv4 Reference Guide stipulates "when additional properties owned by the same entity responsible for the LEED project are contiguous to the project site and have the same or higher lighting z

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Wed Apr 18, 2018, 5:19 pm

ZERO VISITORS

NC-v4 LTc6:Bicycle facilities
posted by  soha yamani  on 

I am working on a substation building with only 4 FTE and zero visitors, am i still obliged to put the 4 short term bicycle racks or only the 4 long term ones as a minimum? 

1
Fri Apr 20, 2018, 3:28 pm