Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

2 or 4 points?

NC-v4 LTc5:Access to quality transit
posted by  Raphael Sperry  on 

Anyone know why you can get 3 points for 144/108 weeday/weekend trips, and 5 for 360/216, but not 4 for 252/162, or 2 points if between teh thresholds for 1 and 3?

3
Mon Apr 2, 2018, 3:21 pm

Batteries, mercury lamps, and electronic waste

NC-v4 MRp1:Storage and collection of recyclables
posted by  Gregory Martin  on 

I was curious how much space for these new items needs to be set aside?

3
Sun Apr 1, 2018, 7:00 pm
2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Sun Apr 1, 2018, 5:44 am
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Mar 30, 2018, 8:44 pm

Insulated Metal Panel

NC-v4 EQc2:Low emitting materials
posted by  Erin Holdenried  on 

Any thoughts how an insulated metal panel would (or would not be included) in the credit for the Option 1 path?  I assume is would not need to be included as it is a factory-finished metal pro

2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Fri Mar 30, 2018, 5:24 pm
4
Default Avatar
LEEDuser Expert
472 thumbs up
Fri Mar 30, 2018, 2:50 pm

Sound Isolation for Regularly Occupied space next to an Electrical room

NC-v4 EQc9:Acoustic performance
posted by  Jill Kurtz  on 

If I have an conference room (occupied area) next to an electrical room, do I...

1
Wed Aug 8, 2018, 1:49 pm

The fan power consumption calculation of PSZ-HP system

Retail-CI-v4 EAp2:Minimum energy performance
posted by  JAMES CHEN  on 

questions:

1. Our current total area of ​​the model: Total Building Area: 191.5 m2, Net Conditioned Building Area: 141.90, Unconditioned Building Area: 49.60m2, 2 Floor

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Mar 30, 2018, 1:10 am

Fenestration - Baseline vs. Proposed

NC-v4 EAp2:Minimum energy performance
posted by  Fábio Batista  on 

Hi all,

I have 3 questions to ask:

1.

1
Thu Mar 29, 2018, 6:06 pm

Documentation for Material Reuse?

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Megan White  on 

What is required for documentation of material reuse? In the Ref Guide (p.535), it says projects should track original location of the material before remove.

3
Thu Mar 29, 2018, 4:19 pm