Forum quick links
2 or 4 points?
NC-v4 LTc5:Access to quality transitposted by Raphael Sperry on
Anyone know why you can get 3 points for 144/108 weeday/weekend trips, and 5 for 360/216, but not 4 for 252/162, or 2 points if between teh thresholds for 1 and 3?
Batteries, mercury lamps, and electronic waste
NC-v4 MRp1:Storage and collection of recyclablesposted by Gregory Martin on
I was curious how much space for these new items needs to be set aside?
LEED ND - Transportation Demand Management : Vehicle-share spaces with high/low frequency transit
ND-Plan-v4 NPDc8:Transportation demand managementposted by Nuttanee Vongveeranonchai on
Dear all,
LEED V4 NC Healthcare project EAc2 points table guidance?
NC-v4 EAc2:Optimize energy performanceposted by Aditya Potipireddi on
Hello All,
Insulated Metal Panel
NC-v4 EQc2:Low emitting materialsposted by Erin Holdenried on
Any thoughts how an insulated metal panel would (or would not be included) in the credit for the Option 1 path? I assume is would not need to be included as it is a factory-finished metal pro
Previous Owner to Demolish Building Prior to Our New Owner Taking Control
NC-v4 MRp2:Construction and demolition waste management planningposted by Steven Blais on
Our client is negotiating to lease or acquire property to construct new facilities.
Sound Isolation for Regularly Occupied space next to an Electrical room
NC-v4 EQc9:Acoustic performanceposted by Jill Kurtz on
If I have an conference room (occupied area) next to an electrical room, do I...
The fan power consumption calculation of PSZ-HP system
Retail-CI-v4 EAp2:Minimum energy performanceposted by JAMES CHEN on
questions:
1. Our current total area of the model: Total Building Area: 191.5 m2, Net Conditioned Building Area: 141.90, Unconditioned Building Area: 49.60m2, 2 Floor
Fenestration - Baseline vs. Proposed
NC-v4 EAp2:Minimum energy performanceposted by Fábio Batista on
Hi all,
I have 3 questions to ask:
1.
Documentation for Material Reuse?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Megan White on
What is required for documentation of material reuse? In the Ref Guide (p.535), it says projects should track original location of the material before remove.