Flush-out option preferred, but some furniture delivery delayed

NC-v4 EQc4:Indoor air quality assessment
posted by  Erica Downs  on 

The project contractor intends to do a full flush-out prior to occupancy.  Most of the furniture will be installed prior to flush-out, but on particular oder has been delayed and may not arriv

12
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Thu Jun 27, 2024, 3:48 pm
2
ESG consultant, LEED AP BD+C
Self Employed
LEEDuser Basic Member
36 thumbs up
Tue Jun 25, 2024, 7:27 pm

Purple Roof

NC-v4 SSc5:Heat island reduction
posted by  Edgar Arevalo  on 

Has anyone encountered a project where the client or other circumstances suggested we look into purple roof solution.  From the looks of it, it's a green roof solution with optimized stormwate

2
ESG consultant, LEED AP BD+C
Self Employed
LEEDuser Basic Member
36 thumbs up
Sun Jun 23, 2024, 11:50 pm

Entryway system

CI-v4 EQc1:Enhanced indoor air quality strategies
posted by  RAMON CHRISTOPHER MEDRANO  on 

I have a office space project, that will have an entryway system (walk off matt).

4
Sun Jun 23, 2024, 10:02 am
4
Sat Jun 22, 2024, 9:03 pm

Minimum Program Requirements - Must use a reasonable site boundary: site + building

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Theresa Lehman  on 

This is a complex, multi-part question. An airport project is being phased and has multiple contracts. The scope includes replacing the runways and concrete around the terminals.

1
Fri Jun 21, 2024, 3:29 pm
3
Sustainability Consultant
WSP
LEEDuser Expert
0 thumbs up
Fri Jun 21, 2024, 2:42 pm
12
Wed Jun 19, 2024, 1:02 pm

If i demonstrate prerequisite compliance with calculator and further if my project uses recycled water then will project be awar

NC-v4 WEc1:Outdoor water use reduction
posted by  Nandan Tavkar  on 

If i demonstrate prerequisite compliance with calculator and further if my project uses recycled water then will project be awarded as 100% reduction (2 points)? Please confirm 

1
Fri Jun 21, 2024, 2:40 pm

Building Product Disclosure and Optimization required documentation

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Marcelo Alencar Pereira  on 

Do I need to submit the purchase invoice or any other documentation confirming product acquisition when applying for Building Product Disclosure and Optimization credits on LEED Online?

3